Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 438 SW MULBERRY DR LAKE CITY FL 32024
Parcel #: 02856-136
Acres: 0.49
Owner: Maronda Homes Inc Of Florida
Subdivision: Timberlands
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 25317
Permit #: 000029741
Related Permit: Culvert: 000001912
Submitted: Monday, October 24, 2011
Issued: Monday, October 24, 2011
Expires: Thursday, March 1, 2012
Completed: Thursday, March 1, 2012
Status: Completed
Septic Release? No
Notes:
MINIMUM FLOOR ELEVATION SET @ 97' PER PLAT ELEVATION CONFIRMATION LETTER REQUIRED AT SLAB @ MINIMUM OF 97' NOC ON FILE,CONFIR. LETTER RECEIVED,12-6-11
Job Details
Finished floor requirement
Fema map number 12023C0289D
This is the construction of a SFD, UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 2
Heated Area (Sqft) 3377.00
Total Area (Sqft) 3946.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
Contractors
Name/ Business License Title Role
Kenneth Wayne Campbell Jr

CBC058803
Inspections
Inspection Notes Performed By Date
Foundation Inspection Troy Crews 11/15/2011
Setback Inspection Troy Crews 11/15/2011
Temporary Power Inspection Randy Jones 12/2/2011
Underslab Rough Plumbing Inspection Randy Jones 12/2/2011
Temporary Power Inspection Randy Jones 12/2/2011
Slab Inspection Troy Crews 12/6/2011
Perimeter Beam/Column Inspection Troy Crews 12/13/2011
Framing Inspection Troy Crews 1/12/2012
Rough-In Plumbing Inspection Troy Crews 1/12/2012
Electrical Rough-In Inspection Troy Crews 1/12/2012
Heat and Air Duct Inspection Troy Crews 1/12/2012
Insulation Inspection Troy Crews 1/17/2012
Permanent Power Inspection Troy Crews 2/17/2012
Final Inspection Troy Crews 3/1/2012
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/1/2012