Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 244 SW PINEHURST DR
LAKE CITY, FL 32024
Parcel #: 03087-127
Acres: 0.68
Owner: Michael & Julie Branch
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 44176
Permit #: 000039159
Related Permit: Culvert: 000039160
Submitted:
Issued: Thursday, January 16, 2020
Expires: Thursday, July 23, 2020
Completed: Thursday, July 23, 2020
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION - 103.5' PER PLAT, NEED ELEVATION LETTER AT SLAB, ENGINEER LETTER RECEIVED STATING THE MINIMUM FINISHED FLOOR ELEVATION MUST BE AT LEAST 95.10' TO PROTECT AGAINST WATER DAMAGE DURING A 100 YEAR STORM EVENT. RECEIVED A FINISHED FLOOR ELEVATION LETTER AT 100.32'.
Job Details
Finished floor requirement
Fema map number 12023C0283D
PV Type Utility Interactive PV System- (DC to AC with utility connection)
Grounding N.E.C. Chapter 690
AC Options Exposed;USE-2
AC Options (Cont..) In Conduit;THWN-2
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Power Company Florida Power and Light
Residential or Commercial? Residential
Where are the panels mounted? Roof Mounted
Service Amps 15
Review Notes
1/16/2020 Permit Issued
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
CBC1259633 Cert Building Contractor
Ryan C Beville
Rbi Electrical Contracting Llc
EC13004236 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Jeremy D Butler
Tri County Roofing & Repair
County License & State License & Liability Insurance & Workers Comp Expired.
CCC1326747 Cert. Roofing Subcontractor
Jeffrey Bokor
Dwc Contracting Llc
CCC1329756 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Tommy Matthews 1/21/2020
Passed: Engineering - Setbacks Tommy Matthews 1/21/2020
Passed: Electrical - Temporary Service Matt Forsyth 2/4/2020
Release to power company Matt Forsyth 2/4/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 2/4/2020
Passed: Building - Slab A Perimeter Termite Treatment Is Provided At A Later Date Matt Forsyth 2/7/2020
Passed: Building - Roof Decking Matt Forsyth 3/9/2020
Passed: Building - Ext Strapping/Wall Sheathing Wall Sheeting Only Need Strapping Matt Forsyth 3/9/2020
Passed: Building - Framing Matt Forsyth 3/26/2020
Passed: Electrical - 2nd Rough-In Matt Forsyth 3/26/2020
Passed: Mechanical - Rough In Matt Forsyth 3/26/2020
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 3/26/2020
Cancelled: Building - Insulation Matt Forsyth 3/30/2020
Passed: Building - Insulation Walls Only Matt Forsyth 3/31/2020
Septic Release Inspection Driveway Final Health Dept 5/7/2020
Passed: Engineering - Initial Driveway Mccormick, David 5/8/2020
Passed: Engineering - Final Driveway Smith, Blake 6/19/2020
Passed: Electrical - Permanent Power Need Driveway Release passed 06.19.20 Matt Forsyth 6/19/2020
Release to power company Final On Driveway Passed On 06.19.20 Matt Forsyth 6/24/2020
Passed: Building - Final Matt Forsyth 7/23/2020
Documents
File Name Date File Size