Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit
Address 215 SW WINDSWEPT GLN
LAKE CITY, FL 32024
Parcel #: 03120-109
Acres: 1.73
Owner: Do It Yourself Lettering, Inc.
Subdivision: Windswept Industrial
Zoning: ILW
Flood Zone: X
District: 3
Application #: 40253
Permit #: 000037717
Related Permit: Culvert: 000002741
Submitted: Tuesday, February 5, 2019
Issued: Tuesday, February 5, 2019
Expires: Wednesday, July 3, 2019
Completed: Wednesday, July 3, 2019
Status: Completed
Septic Release? Yes
Notes:
MFE PER SDP IS 99.70'. NEED ELEVATION CONFIRMATION LETTER @ SLAB, NOC ON FILE. ELEVATION LETTER REC'D AT 99.84'
Job Details
This is the construction of a: OFFICE/SHOP FACILITY
Heated Area (Sqft) 1560
Total Area (Sqft) 9000.00
Stories 1
Building Height 20
Driveway access to property: Culvert Permit
Is there a Fire Sprinkler System? No
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Business
Occupancy Use Title Business/Storage
Design Occupant Load 44
Setbacks Front 20.00
Setback Side 1 15.00
Setback Side 2 15.00
Setback Rear 15.00
Septic# (00-0000) or (X00-000) 19-0086
Dev Permit # F023-
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0381D
Review Notes
Contractors
Name/ Business License Title Role
David Simque

CGC151165
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 2/13/2019
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 2/13/2019
Passed: Building - Slab Mono Slab Troy Crews 2/15/2019
Passed: Building - Framing Troy Crews 5/16/2019
Passed: Electrical - Rough In Troy Crews 5/16/2019
Passed: Mechanical - Rough In Troy Crews 5/16/2019
Rescheduled 6/24/2019:Electrical - Permanent Power Troy Crews 6/21/2019
Passed: Engineering - Final Driveway Mccormick, David 6/24/2019
Passed: Electrical - Permanent Power Need Health And Driveway Release Troy Crews 6/24/2019
Release to power company All Docs Were Rec'd To Release Power. Tc 6/25/2019
Septic Release Inspection Health Dept 6/25/2019
Passed: Engineering - Zoning Final Inspection Done On 7/2/19 Brandon Stubbs 7/1/2019
Passed: Building - Final Release Pending Fire And Zoning Release Troy Crews 7/1/2019
Passed: Fire - Fire Final Tad Cervantes 7/1/2019