Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 590 NW HIGH POINT DR
LAKE CITY, FL 32055
Parcel #: 02202-111
Acres: 5.41
Owner: Wesley & Lisa Hunter
Subdivision: High Point
Zoning: PRD
Flood Zone: X
District: 3
Application #: 42597
Permit #: 000038607
Related Permit: Culvert Waiver: 000002879
Submitted: Friday, September 13, 2019
Issued: Friday, September 13, 2019
Expires: Friday, March 13, 2020
Completed: Friday, March 13, 2020
Status: Completed
Septic Release? Yes
Notes:
NOC ON FILE, FLOOR 1' ABOVE ROAD, REAR-200' BUFFER NO STRUCTURES PERMITTED
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2242.00
Total Area (Sqft) 3571.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 200.00
Septic# (00-0000) or (X00-000) 1908-75
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0280D
Review Notes
Contractors
Name/ Business License Title Role
Kevin Bedenbaugh

CGC1516042
Inspections
Inspection Notes Performed By Date
Cancelled: Building - Footer Cancelled Per Kevin Laurie Hodson 9/16/2019
Cancelled: Engineering - Setbacks Cancelled Per Kevin Laurie Hodson 9/16/2019
Passed: Building - Footer Troy Crews 9/17/2019
Passed: Engineering - Setbacks 200 Ft Line Marked By Surveyor Troy Crews 9/17/2019
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 10/1/2019
Passed: Building - Slab Troy Crews 10/7/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 11/5/2019
Passed: Building - Roof Decking Troy Crews 11/5/2019
Passed: Building - Framing Matt Forsyth 11/27/2019
Passed: Electrical - 2nd Rough-In Matt Forsyth 11/27/2019
Passed: Mechanical - Above Ceiling Matt Forsyth 11/27/2019
Passed: Mechanical - Rough In Matt Forsyth 11/27/2019
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 11/27/2019
Passed: Building - Insulation Troy Crews 12/9/2019
Septic Release Inspection Health Dept 12/10/2019
Passed: Electrical - Permanent Power Troy Crews 2/18/2020
Release to power company Troy Crews 2/18/2020
Failed: Building - Final Need Ground Fault Circuit Interrupter Receptacles Checked Throughout House Matt Forsyth 3/10/2020
Passed: Building - Final Matt Forsyth 3/13/2020