Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 426 SW PINEHURST DR
LAKE CITY, FL 32024
Parcel #: 03087-123
Acres: 0.73
Owner: Brady Wilkinson & Ashley Beckman
Subdivision: Forest Country Sixth Addition
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 47388
Permit #: 000040773
Related Permit: Culvert: 000040774
Submitted: Monday, September 28, 2020
Issued: Monday, December 28, 2020
Expires: Wednesday, April 28, 2021
Completed: Wednesday, April 28, 2021
Status: Completed
Septic Release? Yes
Notes:
AFTER PERMITTED AN ENGINEER ELEVATION LETTER WAS SUBMITTED STATING THE MINIMUM FINISHED FLOOR ELEVATION OF 99.67' WOULD SUFFICIENT TO PROTECT THE STRUCTURE FROM A BASE FLOOD EVENT, SEE ATTACHED LETTER. BY NAILING A SURVEYORS ELEVATION CONFIRMATION LETTER IS REQUIRED. PERMIT WAS UPDATED. ELEVATION CONFIRMATION LETTER REC'D AT 99.67'
Job Details
Finished floor requirement
Fema map number 12023C0381D
Building Permit # 000023095
Review Notes
9/28/2020 Application pending.
9/30/2020 Point Review - Printed-Online Application
9/30/2020 Point Review - On Hold-Incomplete
9/30/2020 Point Review - Email Sent
10/2/2020 Point Review - Reviewed
10/2/2020 Plan Review - On Hold-Incomplete
10/5/2020 Zoning Review - Reviewed
10/9/2020 Plan Review - Documents Required
10/9/2020 Plan Review - Documents Required
10/13/2020 Plan Review - Documents Required
10/21/2020 Plan Review - Reviewed
10/21/2020 Zoning Review - Reviewed
10/21/2020 Final Review - Documents Required
10/22/2020 Final Review - Payment Needed
10/22/2020 Permit Issued Permit #000040773 created and approved.
12/28/2020 Permit reissued to reflect updated information.
4/6/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 10/23/2020
Passed: Building - Footer Matt Forsyth 11/10/2020
Passed: Engineering - Setbacks Matt Forsyth 11/10/2020
Cancelled: Building - Footer Matt Forsyth 11/12/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 12/1/2020
Passed: Building - Slab Need To Chair Up Front Perimeter #5 Bar Need Concrete Ticket Showing Fiber Mesh Used In Slab Left In Permit Box Matt Forsyth 12/4/2020
Passed: Electrical - Temporary Service Matt Forsyth 12/29/2020
Release to power company Matt Forsyth 12/29/2020
Release to power company 1/21/2021
Passed: Building - Roof Decking Matt Forsyth 1/21/2021
Passed: Building - Wall Sheathing Matt Forsyth 1/21/2021
Failed: Building - Framing Missed Nailing On Some Headers And Porch Beams Matt Forsyth 1/27/2021
Failed: Building - Framing Check All Headers For Correct Nail Spacing Including Outside Of Porch Beams, Install Porch Post With Strapping,and Missing Heavy Girder Tie Downs At Garage Troy Crews 2/5/2021
Passed: Building - Framing Porch Strapping Will Be Installed After Rollock Masonry Matt Forsyth 2/9/2021
Passed: Building - Strapping Strapping Complete Matt Forsyth 2/18/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 2/19/2021
Passed: Mechanical - Rough In Matt Forsyth 2/19/2021
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 2/19/2021
Passed: Building - Insulation Matt Forsyth 3/9/2021
Passed: Electrical - Permanent Power Need Septic And Drive Releases-- Drive Rec'd-- Need Septic Matt Forsyth 4/8/2021
Passed: Engineering - Final Driveway Mccormick, David 4/14/2021
Septic Release Inspection Health Dept 4/14/2021
Release to power company Melissa Garber 4/15/2021
Passed: Building - Final Matt Forsyth 4/28/2021