Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 325 SW EMORYWOOD GLN
LAKE CITY, FL 32024
Parcel #: 03397-103
Acres: 5.00
Owner: David And Ellie Miller
Subdivision: Cove At Rose Creek
Zoning: A-3
Flood Zone: X
District: 5
Application #: 46989
Permit #: 000040623
Related Permit: Culvert Waiver: 000040624
Submitted: Friday, August 7, 2020
Issued: Monday, September 28, 2020
Expires: Thursday, June 24, 2021
Completed: Thursday, June 24, 2021
Status: Completed
Septic Release? Yes
Notes:
LOT WAS SPLIT INTO TWO NONCONFORMING LOTS. PERMIT WILL BE ISSUED BASED ON THE PARCELS BEING DEEDED AS ONE TO THE SAME OWNER AND AS THE LOT WAS ORIGINALLY PLATTED. ELEVATION CONFIRMATION RECEIVED 85.3 FT.
Job Details
Finished floor requirement
Fema map number 12023C0480C
Type Roofing Job Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) New metal over existing shingles
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 8500
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? Metal over existing shingles
Type of New Roofing Product Metal
Florida Product Approval Number 17992.IR2
Product Manufacturer Capital Metal
Product Description 29 Gauge Metal
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. Metal on pine 1x4s on 24'' centers over existing shingles
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
8/7/2020 Application pending.
8/10/2020 Point Review - Printed-Online Application
8/10/2020 Point Review - Reviewed
8/10/2020 Zoning Review - Reviewed
8/13/2020 Plan Review - Documents Required
8/19/2020 Plan Review - Documents Required
8/27/2020 Zoning Review - Reviewed
9/28/2020 Permit Issued Permit #000040623 created and approved.
5/4/2021 Final Review - Payment Needed TC - PLAN REVIEW OK 9.28.2020 NEEDED: EH-REC'D 9-28-20
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 10/7/2020
Passed: Engineering - Setbacks Troy Crews 10/7/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 10/16/2020
Passed: Building - Slab Troy Crews 10/20/2020
Passed: Electrical - Temporary Service Troy Crews 10/20/2020
Release to power company Troy Crews 10/20/2020
Cancelled: Building - Framing Matt Forsyth 11/30/2020
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 11/30/2020
Passed: Building - Roof Decking Matt Forsyth 11/30/2020
Passed: Building - Framing Add King Studs Back Double Window Troy Crews 2/5/2021
Passed: Building - Insulation Troy Crews 2/5/2021
Passed: Electrical - 2nd Rough-In Troy Crews 2/5/2021
Passed: Mechanical - Rough In Troy Crews 2/5/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 2/5/2021
Passed: Electrical - Permanent Power Need Septic Final Troy Crews 5/5/2021
Release to power company Melissa Garber 5/6/2021
Septic Release Inspection Health Dept 5/6/2021
Passed: Building - Final Matt Forsyth 6/24/2021