Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
8/4/2020 |
Passed: Building - Footer |
|
Troy Crews |
8/13/2020 |
Passed: Engineering - Setbacks |
|
Troy Crews |
8/13/2020 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
8/13/2020 |
Release to power company |
|
Troy Crews |
8/13/2020 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
8/28/2020 |
Passed: Building - Slab |
|
Troy Crews |
9/8/2020 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Troy Crews |
11/10/2020 |
Passed: Building - Framing |
|
Troy Crews |
11/10/2020 |
Passed: Building - Roof Decking |
|
Troy Crews |
11/10/2020 |
Passed: Building - Strapping |
|
Troy Crews |
11/10/2020 |
Passed: Building - Wall Sheathing |
|
Troy Crews |
11/10/2020 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
12/4/2020 |
Failed: Mechanical - Rough In |
Check Strapping On Bath Fan Ducts, Check Crushed Areas Near Master Bath Supply, Range Duct Put Crimp Ends Down To Prevent Grease Capture. Call Back In With Insulation Insp. |
Troy Crews |
12/4/2020 |
Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete |
Troy Crews |
12/4/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
12/9/2020 |
Passed: Mechanical - Rough In |
Put Proper Nail Plate On Dryer Vent Prior To Drywall |
Troy Crews |
12/9/2020 |
Passed: Building - Insulation |
|
Troy Crews |
12/14/2020 |
Passed: Electrical - Permanent Power |
Need Driveway And Septic Final |
Troy Crews |
2/15/2021 |
Septic Release Inspection |
|
Health Dept |
2/23/2021 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
2/24/2021 |
Release to power company |
Rec'd Pwd Approval On Driveway Final |
Troy Crews |
2/25/2021 |
Failed: Building - Final |
Master Bath Shower Floor Not Complete, Kitchen Hood Not Completed. |
Anthony Aslan |
3/29/2021 |
Passed: Building - Final |
|
Anthony Aslan |
4/5/2021 |