Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 561 SW MEADOW WOOD GLN
LAKE CITY, FL 32024
Parcel #: 00276-106
Acres: 5.01
Owner: Gomez Cecile
Subdivision: Meadow Wood
Zoning: A-3
Flood Zone: X
District: 2
Application #: 44887
Permit #: 000039643
Related Permit: Culvert: 000039653
Submitted:
Issued: Tuesday, April 21, 2020
Expires: Wednesday, October 7, 2020
Completed: Wednesday, October 7, 2020
Status: Completed
Septic Release? Yes
Notes:
FINISHED FLOOR ELEVATION LETTER REC'D 9.2.20 AT 8" ABOVE THE HIGHEST ADJACENT GRADE
Job Details
Finished floor requirement
Fema map number 12023C0280D
In floodway N
Is this for residential or commercial use? Residential
This is the construction of a: Pool
ADA Compliant Yes
Setbacks Front 30'
Setback Side 1 25'
Setbacks Rear 25'
Setback Side 2 25'
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Septic# (00-0000) or (X00-000) 23-0606
Service Amps 100
Review Notes
3/31/2020 Application pending.
4/15/2020 Point Review - Status Cleared
4/21/2020 Zoning Review - Completed/Sent for Final Review
4/21/2020 Final Review - Completed/Sent for Final Review
4/21/2020 Permit Issued Permit #000039643 created and approved.
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction Inc
CBC054575 Cert.building Contractor Contractor
Cody Barrs
Barrs Plumbing,inc.
CFC1427145 Plumbing Contractor Subcontractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air, Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 4/29/2020
Passed: Engineering - Setbacks Matt Forsyth 4/29/2020
Failed: Electrical - Temporary Service Unprotected Receptacles Infield Matt Forsyth 5/8/2020
Failed: Electrical - Temporary Service Need Gfci Receptacles For Job Site Matt Forsyth 5/11/2020
Passed: Electrical - Temporary Service Matt Forsyth 5/11/2020
Release to power company Matt Forsyth 5/11/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 5/14/2020
Passed: Building - Slab Matt Forsyth 5/19/2020
Cancelled: Building - Ext Strapping/Wall Sheathing Matt Forsyth 6/9/2020
Cancelled: Building - Framing Matt Forsyth 6/9/2020
Cancelled: Building - Roof Decking Matt Forsyth 6/9/2020
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 6/16/2020
Passed: Building - Framing Matt Forsyth 6/16/2020
Passed: Building - Roof Decking Matt Forsyth 6/16/2020
Passed: Electrical - 2nd Rough-In Matt Forsyth 6/24/2020
Passed: Mechanical - Rough In Matt Forsyth 6/24/2020
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 6/24/2020
Passed: Building - Insulation Matt Forsyth 7/14/2020
Passed: Electrical - Permanent Power Need Floor Elevations To Release Power, Rec'd 9.2.20 Matt Forsyth 8/25/2020
Passed: Engineering - Final Driveway Mccormick, David 8/31/2020
Release to power company Elevation Letter Rec'd Laurie Hodson 9/2/2020
Release to power company Laurie Hodson 9/3/2020
Septic Release Inspection Health Dept 9/3/2020
Failed: Building - Final Need Blower Door Test Back Porch Has Open Ground On Receptacles Matt Forsyth 10/5/2020
Passed: Building - Final Matt Forsyth 10/7/2020
Documents
File Name Date File Size