Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
|
Anthony Aslan |
2/26/2021 |
Passed: Engineering - Setbacks |
Tight Lot Lines, Needs Verification By Surveyor |
Anthony Aslan |
2/26/2021 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
3/22/2021 |
Passed: Building - Slab |
|
Anthony Aslan |
3/31/2021 |
Passed: Building - Roof Decking |
|
Anthony Aslan |
5/12/2021 |
Failed: Building - Strapping |
Nails In Straps Missing Or Pushed Out |
Anthony Aslan |
5/12/2021 |
Passed: Building - Wall Sheathing |
Missing Nails On Garage Side Top Of Window Marked With Red Marker |
Anthony Aslan |
5/12/2021 |
Rescheduled 5/14/2021:Building - Ext Strapping/Wall Sheathing |
|
Anthony Aslan |
5/13/2021 |
Passed: Building - Ext Strapping/Wall Sheathing |
Waiting On Engineer Letter For Strapping. |
Anthony Aslan |
5/14/2021 |
Failed: Electrical - 2nd Rough-In |
Missing Nail Guards |
Anthony Aslan |
6/14/2021 |
Failed: Mechanical - Rough In |
Need Metal Strap On Supply Duct, Black Strap Is Sufficient
missing Dryer Duct |
Anthony Aslan |
6/14/2021 |
Failed: Plumbing/Gas - 2nd Rough-In |
Missing Nail Guards |
Anthony Aslan |
6/14/2021 |
Failed: Plumbing/Gas - Tub Set/Shower Pan |
No Tub Installed |
Anthony Aslan |
6/14/2021 |
Failed: Building - Framing |
Missing Master Windows, Front & Back Porch Doors |
Anthony Aslan |
6/14/2021 |
Passed: Electrical - 2nd Rough-In |
Nail Guards Installed |
Anthony Aslan |
6/23/2021 |
Passed: Mechanical - Rough In |
Corrections Made |
Anthony Aslan |
6/23/2021 |
Passed: Plumbing/Gas - 2nd Rough-In |
Nail Guards Installed |
Anthony Aslan |
6/23/2021 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Installed |
Anthony Aslan |
6/23/2021 |
Passed: Building - Framing |
|
Anthony Aslan |
6/24/2021 |
Passed: Building - Insulation |
|
Anthony Aslan |
6/25/2021 |
Cancelled: Electrical - Permanent Power |
|
Melissa Garber |
8/25/2021 |
Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
8/26/2021 |
Release to power company |
|
Melissa Garber |
9/3/2021 |
Septic Release Inspection |
|
Health Dept |
9/3/2021 |
Passed: Building - Final |
Waiting On Pictures A/c Lock Cap, Hose Bibs Back Flow. |
Anthony Aslan |
9/27/2021 |
Certificate-Release Certificate |
|
Anthony Aslan |
9/28/2021 |