Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 209 SW POPPY GLN
LAKE CITY, FL 32024
Parcel #: 03023-529
Acres: 0.51
Owner: Peurrung Joseph C
Subdivision: Rolling Meadows
Zoning: RSF-2
Flood Zone: A
District: 3
Application #: 46800
Permit #: 000040530
Related Permit: Culvert: 000040531
Submitted:
Issued: Tuesday, September 15, 2020
Expires: Monday, October 11, 2021
Completed: Monday, October 11, 2021
Status: Completed
Septic Release? Yes
Notes:
ELEVATION CONFIRMATION LETTER REC'D @ 108.61'
Job Details
Finished floor requirement
Fema map number 12023C0383D
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 9489
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number fl10674-r13
Product Manufacturer Owens Corning
Product Description Architectural Shingles
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
7/17/2020 Point Review - Received-Hard Copy Application
7/17/2020 Point Review - Reviewed
7/20/2020 Zoning Review - Reviewed
7/30/2020 Plan Review - Reviewed
8/5/2020 Zoning Review - Reviewed
8/5/2020 Final Review - Documents Required
8/25/2020 Final Review - Documents Required
9/14/2020 Final Review - Payment Needed
9/15/2020 Permit Issued
6/2/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Joseph C Peurrung
Benchmark Builders Llc
CBC1259347 Cert. Building Contractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Robert Jarvis
Jarvis Heat And Air Llc
CAC1816766 Class "b" A/c Subcontractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Wilmer K Marshall Jr
Marlin Construction Of Indian River County Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CCC056851 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Engineering - Final Driveway Needs To Install Culvert, Needs Culvert Permit. Mccormick, David 10/15/2020
Cancelled: Plumbing/Gas - 1st Underground Rough–In Melissa Garber 10/15/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 10/19/2020
Passed: Engineering - Initial Driveway Mccormick, David 10/21/2020
Passed: Building - Monolithic Slab Matt Forsyth 10/21/2020
Passed: Engineering - Setbacks Matt Forsyth 10/21/2020
Release to power company Sent To Wrong Power Comp. Matt Forsyth 10/26/2020
Passed: Electrical - Temporary Service Matt Forsyth 10/26/2020
Release to power company Matt Forsyth 10/26/2020
Passed: Building - Wall Sheathing Need Survey On Ffe Matt Forsyth 11/13/2020
Passed: Building - Insulation Matt Forsyth 2/2/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 2/2/2021
Failed: Mechanical - Rough In Need Weatherstripping On Hvac Registers And 181 Tape Ventilation Duct In Bathrooms Matt Forsyth 2/2/2021
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 2/2/2021
Failed: Building - Framing Need To See Anchor Bolts Do Not Drywall Matt Forsyth 2/2/2021
Passed: Building - Framing Matt Forsyth 2/3/2021
Passed: Mechanical - Rough In Matt Forsyth 2/3/2021
Septic Release Inspection Health Dept 4/23/2021
Passed: Electrical - Permanent Power Need Culvert Final For Release Troy Crews 6/2/2021
Passed: Engineering - Final Driveway Mccormick, David 6/3/2021
Release to power company Melissa Garber 6/8/2021
Cancelled: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 6/8/2021
Cancelled: Building - Final Melissa Garber 6/8/2021
Cancelled: Electrical - Permanent Power Troy Crews 8/5/2021
Failed: Building - Final Final Termite Sticker On Electrical Panel Inside,blower Door Test Needed,overflow Pipe Not Found For Hot Water Heater Outside,ground Rod Needs To Be Driven Down To Finished Grade Matt Forsyth 8/6/2021
Failed: Building - Final Items Were Not Addressed That Failed House Locked Up Matt Forsyth 9/28/2021
Passed: Building - Final Matt Forsyth 10/11/2021