Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 894 SE GABE ST
LAKE CITY, FL 32025
Parcel #: 09205-004
Acres: 58.35
Owner: Stalvey Brandon R
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 46226
Permit #: 000039946
Related Permit: Culvert: 000039882
Submitted:
Issued: Monday, June 15, 2020
Expires: Thursday, June 10, 2021
Completed: Thursday, June 10, 2021
Status: Completed
Septic Release? Yes
Notes:
EXISTING MOBILE HOME REMOVED FROM THE PROPERTY PER CONTRACTOR
Job Details
Elevation regulation Accessory Use
Finished floor requirement Non-Habitable Structure
Fema map number 12023C0390C
Type of Structure Storage Building
Commercial or Residential? Residential
Total Area (Sqft) 1200
Septic# (00-0000) or (X00-000) 25-0731
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setback Rear 10' (ACCESSORY)
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Storage
Occupancy Use Title NON-HABITABLE STRUCTURE
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height 16'
Length 40'
Width 30'
Service Amps 200
Slab New
Mechanical No
Electrical No
Plumbing No
Review Notes
5/13/2020 Application pending.
5/15/2020 Point Review - Processing
5/29/2020 Zoning Review - On Hold-Incomplete
5/29/2020 Zoning Review - Email Sent
6/1/2020 Plan Review - Documents Required
6/2/2020 Plan Review - Reviewed
6/2/2020 Final Review - Documents Required
6/15/2020 Permit Issued
Contractors
Name/ Business License Title Role
Isaiah Cully
Ic Construction Llc
CBC1259655 Building Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Tyler M Turner
Tmt Roofing Llc
CCC1330410 Cert Roofing Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Final Driveway Mccormick, David 6/16/2020
Passed: Electrical - Temporary Service No Structural Inspections Until Noc Is Received Troy Crews 8/5/2020
Release to power company Troy Crews 8/5/2020
Passed: Building - Footer Reminder Install Ground Wire On Footer Steel Troy Crews 9/4/2020
Passed: Engineering - Setbacks Troy Crews 9/4/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 9/23/2020
Passed: Building - Slab Troy Crews 9/28/2020
Passed: Building - Roof Decking Troy Crews 10/28/2020
Passed: Building - Wall Sheathing Troy Crews 10/28/2020
Passed: Electrical - 2nd Rough-In Troy Crews 12/2/2020
Failed: Plumbing/Gas - 2nd Rough-In Pressure Lost On Water Lines Troy Crews 12/2/2020
Failed: Building - Framing T-08 Truss Needs Additional Strapping Troy Crews 12/2/2020
Failed: Mechanical - Rough In Exhaust Duct For Oven Must Have Smooth Interior , Questions About Approved Tape For Duct Connections, Access To Fresh Air Motor ? Will Send E-mail Need To Meet Duct Insatllers Onsite. Aslo Need Strapping On Bath Fan Ducts. Troy Crews 12/2/2020
Failed: Plumbing/Gas - 2nd Rough-In Pressure Lost On Water Lines Troy Crews 1/20/2021
Passed: Building - Framing Truss Corrected Troy Crews 1/20/2021
Passed: Mechanical - Rough In Items Corrected Troy Crews 1/20/2021
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 1/21/2021
Failed: Engineering - Final Driveway Needs To Get A Culvert Permit. Mccormick, David 4/1/2021
Passed: Engineering - Initial Driveway Mccormick, David 4/6/2021
Passed: Electrical - Permanent Power Need Septic Final Troy Crews 4/23/2021
Passed: Engineering - Final Driveway Mccormick, David 5/4/2021
Septic Release Inspection Need Final Driveway Release Health Dept 5/4/2021
Release to power company Melissa Garber 5/5/2021
Passed: Building - Final Release Pending Letter From Owner Regarding Water Heater L.p. Connection Troy Crews 6/8/2021
Certificate-Release Certificate Troy Crews 6/10/2021
Documents
File Name Date File Size