Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Initial Driveway |
|
Mccormick, David |
7/16/2019 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
7/17/2019 |
Release to power company |
|
Troy Crews |
7/17/2019 |
Passed: Building - Footer |
|
Troy Crews |
7/17/2019 |
Passed: Engineering - Setbacks |
|
Troy Crews |
7/17/2019 |
Failed: Plumbing/Gas - Underground Rough-In |
C Pvc Pipe On All Exterior Walls Needs To Be Sleeved Would Like To See Block Cell Filled With Sand |
Matt Forsyth |
7/31/2019 |
Passed: Plumbing/Gas - Underground Rough-In |
|
Matt Forsyth |
8/2/2019 |
Passed: Building - Slab |
|
Tommy Matthews |
8/6/2019 |
Passed: Building - Roof Decking |
Remove And Replace Exposed Nails. |
Tommy Matthews |
9/3/2019 |
Failed: Building - Ext Strapping/Wall Sheathing |
Need Strapping Placed Prior To Cover Up. This Refers To Columns And Gable Walls. Remove And Replace Exposed Nails. |
Tommy Matthews |
9/3/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Tommy Matthews |
9/4/2019 |
Passed: Building - Framing |
|
Troy Crews |
9/26/2019 |
Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
9/26/2019 |
Passed: Mechanical - Above Ceiling |
|
Troy Crews |
9/26/2019 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
9/26/2019 |
Passed: Building - Insulation |
|
Tommy Matthews |
10/1/2019 |
Septic Release Inspection |
|
Health Dept |
10/31/2019 |
Passed: Electrical - Permanent Power |
Need Driveway Final And Final Grading Ok From Engineer |
Troy Crews |
11/8/2019 |
Passed: Engineering - Final Driveway |
|
Mccormick, David |
11/13/2019 |
Release to power company |
|
Lh |
11/14/2019 |
Passed: Building - Final |
|
Matt Forsyth |
12/4/2019 |