Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 228 NW WHITNEY GLEN
LAKE CITY, FL 32055
Parcel #: 02244-112
Acres: 0.53
Owner: Freedom Mobile Home Sales Inc
Subdivision: Brandon Estates S/d
Zoning: RSF/MH-2
Flood Zone: X
District: 3
Application #: 40583
Permit #: 000037931
Related Permit: Culvert: 000002785
Submitted: Thursday, March 28, 2019
Issued: Friday, October 30, 2020
Expires: Thursday, February 11, 2021
Completed: Thursday, February 11, 2021
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD---PER TROY, AC IS TO BE INSTALLED WHEN UNIT IS SOLD REQUESTED CHANGE OF CONTRACTOR 10/30/2020-- SUPPORTING DOCUMENTS UPLOADED
Job Details
Finished floor requirement
Fema map number 12023C0485C
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Review Notes
10/30/2020 Permit Renewed
Contractors
Name/ Business License Title Role
David Albright
David Albright Mobile Home Svc Llc
IH1129420 Mh Installer (ih) Contractor
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Ronald Bonds Sr
Style Crest Inc
CAC1817658 Class "b" A/c Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Engineering-Initial Driveway David Mccormick 3/29/2019
Passed: Engineering - Final Driveway Mccormick, David 10/30/2020
Passed: Mobile Home - Mobile Home Set-Up Final Need Septic Final Troy Crews 11/2/2020
Passed: Engineering - Setbacks Troy Crews 11/2/2020
Certificate-Release Certificate Troy Crews 2/11/2021
Release to power company Melissa Garber 2/11/2021
Septic Release Inspection Health Dept 2/11/2021
Documents
File Name Date File Size