Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 228 SW TIMBER RIDGE DRIVE
LAKE CITY, FL 32024
Parcel #: 02856-122
Acres: 0.50
Owner: Maronda Homes
Subdivision: Timberlands
Zoning: RSF-2
Flood Zone: X PP
District: 3
Application #: 25096
Permit #: 000027223
Related Permit: Culvert: 000001646
Submitted: Thursday, July 31, 2008
Issued: Thursday, July 31, 2008
Expires: Tuesday, April 7, 2009
Completed: Tuesday, April 7, 2009
Status: Completed
Septic Release? No
Notes:
ELEVATION CONFIRMATION LETTER REQUIRED BEFORE SLAB, MFE AT 96' PER PLAT, NOC ON FILE, COMPACTION TEST RECEIVED CONFIRMATION RECEIVED
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 2527.00
Total Area (Sqft) 3096.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0289D
Review Notes
Contractors
Name/ Business License Title Role
Theodore Brock
Maronda Homes Inc. Of Florida
County License & State License Expired.
CBC1256382 Cert Building
Inspections
Inspection Notes Performed By Date
Underslab Rough Plumbing Inspection Wayne Russ 1/16/2009
Monolithic Slab Inspection Randy Jones 1/20/2009
Setback Inspection Randy Jones 1/20/2009
Monolithic Slab Inspection Randy Jones 1/20/2009
Perimeter Beam/Column Inspection Harry Dicks 1/26/2009
Sheeting and Nailing Inspection Harry Dicks 2/6/2009
Sheathing and Nailing Inspection Harry Dicks 2/6/2009
Framing Inspection Harry Dicks 2/19/2009
Rough-In Plumbing Inspection Harry Dicks 2/19/2009
Electrical Rough-In Inspection Harry Dicks 2/19/2009
Heat and Air Duct Inspection Harry Dicks 2/19/2009
Permanent Power Inspection Wayne Russ 3/20/2009
Final Inspection Wayne Russ 4/7/2009
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 4/7/2009
Temporary Power Inspection Wayne Russ 12/30/2009
Documents
File Name Date File Size
Plans 2021-02-04 11.25.15.467.pdf 2023.12.21 15.12MB
Documentation 20210202 122846.pdf 2023.12.21 24.32MB
Certificate Of Occupancy.pdf 2023.12.21 143.16kB