Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Culvert Permit
Address 176 SW KIMBERLY LN
LAKE CITY, FL 32024
Parcel #: 03026-103
Acres: 1.00
Owner: Lev Joann T, Fochi William A
Subdivision: Kimberly Oaks
Zoning: RR
Flood Zone: X
District: 3
Application #: 64246
Permit #: 000049248
Related Permit: New Residential Construction: 000049256
Submitted: Friday, February 16, 2024
Issued: Tuesday, February 20, 2024
Expires: Friday, February 21, 2025
Completed: Friday, February 21, 2025
Status: Completed
Septic Release? na
Notes:
FINISHED FLOOR PER PLAT 94.50 TO BE CONFIRMED BY ELEVATION CONFIRMATION FROM SURVEYOR
Job Details
Building Permit # 000049256
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min 32’x18’ corr metal culvert w/ concrete mitred ends W/6”x 6” welded wire, rebar or culvert bolts in mitred ends, Concrete mitred ends w- 4ft xL- 5ft and with 4 inches of Limerock on top cover.
Status Approved
Finished floor requirement 94.50
Fema map number 12023C0289D
Review Notes
2/20/2024 Final Review - Reviewed FINISHED FLOOR 94.50 PER PLAT
2/20/2024 Final Review - Payment Needed FINISHED FLOOR 94.50 PER PLAT
2/20/2024 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Joann T Lev
Exceptions Realty Llc
Liability Insurance Expired.
CRC1329719 Cert. Residential Contractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Smith, Blake 2/21/2024
Passed: Engineering - Final Driveway Beach, Garrett 2/21/2025
Documents
File Name Date File Size
Original Permit 20240220.pdf 2024.02.20 134.90kB