Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Culvert Permit
Address 2263 SE OCTOBER RD
LAKE CITY, FL 32025
Parcel #: 09651-000
Acres: 14.70
Owner: King Brandon D, King Tonya M
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 56424
Permit #: 000045422
Related Permit: New Residential Construction: 000045421
Submitted: Monday, September 12, 2022
Issued: Monday, September 12, 2022
Expires: Monday, September 19, 2022
Completed: Monday, September 19, 2022
Status: Completed
Septic Release? na
Notes:
*THERE IS A SIGINIFICANT DIFFERENCE IN THE ELEVATION AT THE ROAD AND THE ELEVATION AT THE PROPOSED HOME SITE. IF THE MINIMUM FLOOR ELEVATION CANNOT BE MET THEN AN ENGINEER LETTER WILL BE REQUIRED.
Job Details
Building Permit # 000045421
Standards Shall conform to Public Works Determinations as stated below
Requirements Install minimum 18x24 corr metal pipe with no miters with min 4 inches of limerock for cover.
Status Approved
Fema map number 12023C0505C
In floodway N
Review Notes
9/12/2022 Final Review - Reviewed NEEDED ENGINEER LETTER NEEDED, APROX. 9 FT. LOWER THAN ROAD PER LIDAR
9/12/2022 Final Review - Payment Needed NEEDED ENGINEER LETTER NEEDED, APROX. 9 FT. LOWER THAN ROAD PER LIDAR
9/12/2022 Permit Issued Permit #000045422 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Smith, Blake 9/14/2022
Passed: Engineering - Final Driveway Smith, Blake 9/19/2022
Documents
File Name Date File Size
Termite Treatment_initial 20221209 022546.pdf 2023.12.24 432.20kB
Original Permit 20220912.pdf 2023.12.24 134.87kB