| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/14/2022 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
9/19/2022 |
| Passed: Building - Footer |
|
Anthony Aslan |
10/12/2022 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
10/12/2022 |
| Passed: Electrical - Temporary Service |
|
Anthony Aslan |
11/30/2022 |
| Release to power company |
|
Anthony Aslan |
11/30/2022 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
12/7/2022 |
| Passed: Building - Slab |
|
Anthony Aslan |
12/9/2022 |
| Cancelled: Building - Framing |
|
Anthony Aslan |
1/23/2023 |
| Passed: Building - Roof Decking |
Next Time Need To See Before Wrap Or Will Have It Pulled Off To Inspect. |
Anthony Aslan |
2/3/2023 |
| Passed: Building - Ext Strapping/Wall Sheathing |
Next Time Need To See Before Wrap Or Will Have It Pulled Off To Inspect. |
Anthony Aslan |
2/3/2023 |
| Passed: Building - Framing |
|
Anthony Aslan |
2/3/2023 |
| Passed: Electrical - 2nd Rough-In |
Any Wall Section 2'ft Or Greater Requires An Outlet |
Anthony Aslan |
2/16/2023 |
| Failed: Mechanical - Rough In |
Master Bath Missing Exhaust Fan |
Anthony Aslan |
2/16/2023 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Not Ready |
Anthony Aslan |
2/16/2023 |
| Cancelled: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/17/2023 |
| Passed: Mechanical - Rough In |
Correction Made |
Anthony Aslan |
2/17/2023 |
| Failed: Plumbing/Gas - 2nd Rough-In |
Not Complete |
Anthony Aslan |
2/17/2023 |
| Cancelled: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/17/2023 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/24/2023 |
| Passed: Building - Insulation |
|
Anthony Aslan |
2/24/2023 |
| Septic Release Inspection |
|
Health Dept |
4/17/2023 |
| Passed: Electrical - Permanent Power |
Need Wire To Island Safety Off (recv'd) |
Anthony Aslan |
5/31/2023 |
| Release to power company |
Recv'd |
Anthony Aslan |
6/13/2023 |
| Failed: Building - Final |
Incomplete Multiple Items |
Anthony Aslan |
6/16/2023 |
| Passed: Building - Final |
Need Final Termite |
Anthony Aslan |
6/21/2023 |
| Certificate-Release Certificate |
Documents Uploaded |
Anthony Aslan |
6/22/2023 |