Mobile Home
Permit
| Application #: | 48617 |
| Permit #: |
000042665 |
| Related Permit: |
|
| Submitted: | Thursday, March 25, 2021 |
| Issued: | Tuesday, August 31, 2021 |
| Expires: | Thursday, March 30, 2023 |
| Completed: | Thursday, March 30, 2023 |
| Status: |
Completed |
| Septic Release? |
Yes |
Job Details
| Elevation regulation |
Minimum Requirement |
| Finished floor requirement |
One foot above the road |
| Fema map number |
12023C0190D |
| In floodway |
N |
| Mobile Home is a: |
Single Wide |
| Year Built |
1984 |
| Width (Ft.In) |
14 |
| Length (Ft.In) |
56 |
| Driveway access to home: |
Existing Drive |
| Installation Decal # |
74937 |
| Special temporary use permit number: |
None |
| Septic # |
23-0211 |
| Setbacks Front |
30' |
| Setback Side 1 |
25' |
| Setbacks Rear |
25' |
| Dev Permit # |
F023- |
| Setback Side 2 |
25' |
| Are you applying for a 5 year temporary permit? |
No |
| Serial # |
C601413231KS31345 |
| Wind Zone? |
2 |
| Residential or Commercial Use? |
Residential |
Review Notes
| 3/3/2021 |
Application pending. |
| 3/25/2021 |
Point Review - Printed-Online Application |
| 3/25/2021 |
Point Review - Reviewed |
| 3/25/2021 |
Plan Review - Reviewed |
| 6/4/2021 |
Final Review - Contact the Building Dept |
| 8/26/2021 |
Zoning Review - Documents Required |
| 8/31/2021 |
Zoning Review - Reviewed |
| 8/31/2021 |
Final Review - Reviewed |
| 8/31/2021 |
Final Review - Payment Needed |
| 8/31/2021 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
David Albright David Albright Mobile Home Svc Llc
|
IH1129420 |
Mh Installer (ih) |
Contractor |
Glenn Whittington Whittington Electric Inc
|
EC13002957 |
Electrical Contractor |
Subcontractor |
Ronald Bonds Sr Style Crest Inc
|
CAC1817658 |
Class "b" A/c Contractor |
Subcontractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Mobile Home - In County Pre-Mobile Home before set-up |
Need Floor And Wall Repair Prior To Final |
Troy Crews |
8/16/2021 |
| Passed: Mobile Home - Mobile Home Set-Up Final |
Need Septic Final |
Troy Crews |
3/14/2023 |
| Passed: Engineering - Setbacks |
|
Troy Crews |
3/14/2023 |
| Release to power company |
|
Melissa Garber |
3/30/2023 |
| Certificate-Release Certificate |
|
Troy Crews |
3/30/2023 |
| Septic Release Inspection |
|
Health Dept |
3/30/2023 |