Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 161 SE HOLLY TER
LAKE CITY, FL 32025
Parcel #: 08366-005
Acres: 1.01
Owner: Roberts Michael & Tris Roberts, Jtwrs
Subdivision: Elm Acres
Zoning: RSF-2
Flood Zone: AH
District: 4
Application #: 47223
Permit #: 000040629
Related Permit: Culvert: 000040628
Submitted:
Issued: Tuesday, September 29, 2020
Expires: Wednesday, January 19, 2022
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
ELEVATION CERTIFICATE MUST INCLUDE MACHINERY SERVICING HOME SUCH AS AIR CONDITIONER
Job Details
Elevation regulation Special Flood Hazard Area
Finished floor requirement 105.50' PER ENGINEER LETTER (#FL20145)
Requirement needed By Permanent Power Inspection
Document needed is an Elevation Certificate for Finished Construction
Document receieved Yes
Fema map number 12023C0313D
Water source Ponding
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1760
Total Area (Sqft) 2600
Building Height 15
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0755
Review Notes
9/8/2020 Point Review - Received-Hard Copy Application
9/10/2020 Zoning Review - Corrections Needed
9/21/2020 Plan Review - Reviewed
9/24/2020 Zoning Review - Reviewed
9/24/2020 Zoning Review - Reviewed
9/25/2020 Final Review - Payment Needed
9/29/2020 Permit Issued
Contractors
Name/ Business License Title Role
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Anthony R Franks
Franks & Lane Heating And Air Llc
CAC1818631 Cert. A/c Class “b” Subcontractor
Kenneth Ault
Kenneth Edward Ault Plumbing Inc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CFC1429807 Cert. Plumbing Subcontractor
Robert A Feasel
Robbie's Roofing, Inc
RC29027319 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 9/29/2020
Passed: Electrical - Temporary Service Troy Crews 10/16/2020
Release to power company Troy Crews 10/16/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 11/3/2020
Passed: Building - Monolithic Slab Need Picture Of Ground Wire, Pota Pottie Onsite Prior To Any Further Inspections Also Note Need Elevation Certificate Troy Crews 11/23/2020
Passed: Engineering - Setbacks Troy Crews 11/23/2020
Failed: Building - Ext Strapping/Wall Sheathing Not Complete Check Front Wall Top And By Front Door, Call Back In With Roof Check Shiners. Troy Crews 12/29/2020
Passed: Building - Roof Decking Troy Crews 12/31/2020
Passed: Building - Wall Sheathing Troy Crews 12/31/2020
Passed: Building - Framing Troy Crews 12/31/2020
Passed: Electrical - 2nd Rough-In Troy Crews 12/31/2020
Failed: Plumbing/Gas - 2nd Rough-In No Pressure On Plumbing Supply Lines. Need Tub And Shower Pan Filled With Water. Anthony Aslan 1/14/2021
Failed: Mechanical - Rough In No Turning Vanes In Hard Back 90's In Supply Trunk. Anthony Aslan 1/14/2021
Passed: Mechanical - Rough In Anthony Aslan 1/15/2021
Failed: Plumbing/Gas - 2nd Rough-In Tub Leaking, Plumbing Tech. Was There Working, Reschedule. Anthony Aslan 1/15/2021
Passed: Building - Insulation Anthony Aslan 1/19/2021
Passed: Plumbing/Gas - Tub Set/Shower Pan Anthony Aslan 1/19/2021
Septic Release Inspection Health Dept 6/9/2021
Passed: Electrical - Permanent Power Cannot Release Power Until Elevation Certificate Is Rec'd And Culvert Final Is Approved. Anthony Aslan 6/24/2021
Release to power company Ec And Culvert Final Rec'd Laurie Hodson 7/13/2021
Passed: Engineering - Final Driveway Mccormick, David 7/13/2021
Passed: Building - Final Need Heat Strips Marked Indicating With Size Anthony Aslan 7/23/2021
Documents
File Name Date File Size