Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Culvert Permit

Address 161 SE HOLLY TER
LAKE CITY, FL 32025
Parcel #: 08366-005
Acres: 1.01
Owner: Roberts Michael & Tris Roberts, Jtwrs
Subdivision: Elm Acres
Zoning: RSF-2
Flood Zone: AH
District: 4
Application #: 47366
Permit #: 000040628
Related Permit: New Residential Construction: 000040629
Submitted: Friday, September 25, 2020
Issued: Tuesday, September 29, 2020
Expires: Tuesday, July 13, 2021
Completed: Tuesday, July 13, 2021
Status: Completed
Septic Release? na
Notes:
ELEVATION CERTIFICATE MUST INCLUDE MACHINERY SERVICING HOME SUCH AS AIR CONDITIONER
Job Details
Elevation regulation Special Flood Hazard Area
Finished floor requirement 105.50' PER ENGINEER LETTER (#FL20145)
Requirement needed By Final Inspection
Document needed is an Elevation Certificate for Finished Construction
Fema map number 12023C0313D
Water source Ponding
In floodway N
Building Permit # 000040629
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Review Notes
9/25/2020 Final Review - Payment Needed
9/29/2020 Permit Issued Permit #000040628 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 9/29/2020
Passed: Engineering - Final Driveway Mccormick, David 7/13/2021
Documents
File Name Date File Size