Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 315 SE LINDALE GLN
LAKE CITY, FL 32025
Parcel #: 07486-110
Acres: 0.46
Owner: Cornerstone Developers Ii, Llc
Subdivision: Haight-ashbury
Zoning: RSF-2
Flood Zone: X
District: 4
Application #: 47241
Permit #: 000040550
Related Permit: Culvert Waiver: 000040551
Submitted:
Issued: Wednesday, September 23, 2020
Expires: Thursday, December 17, 2020
Completed: Thursday, December 17, 2020
Status: Completed
Septic Release? Yes
Notes:
9-23-2020 - MINIMUM FINISHED FLOOR ELEVATION REQUIREMENT CHANGE TO PERMIT - ENGINEER'S LETTER STATES THE MINIMUM FINISHED FLOOR ELEVATION FOR A STRUCTURE ON THIS SITE SHALL BE 119.00' AND A SWALE GRADED BETWEEN THE ROAD AND HOME AND THE CONCRETE DRIVEWAY IS TO BE CONSTRUCTED WITH A SWALE TO PREVENT PRECIPTIATION FROM REACHING THE GARAGE. NOW REQUIRED: A SURVEYORS LETTER CONFIRMING THE ELEVATION OF THE FINISHED FLOOR BY THE NAILING INSPECTION. ELEVATION CONFIRMATION LETTER REC'D AT 119.02' BDT REC'D @ 6.89
Job Details
Finished floor requirement
Fema map number 12023C0311D
If "Other", please explain SWIMMING POOL
Setbacks Front 25.00
Setback Side 1 10.00
Setbacks Rear 15.00
Setback Side 2 10.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
9/10/2020 Point Review - Received-Hard Copy Application
9/10/2020 Zoning Review - Reviewed
9/10/2020 Plan Review - Reviewed
9/10/2020 Final Review - Documents Required
9/18/2020 Permit Issued
9/23/2020 Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
Jerry Castagna
Castagna Construction Inc
County License & State License & Liability Insurance & Workers Comp Expired.
CBC047842 Building Contractor Contractor
Marcus Matthews
Matthews Electric Llc
EC13005459 Electrical Contractor Subcontractor
Derrick L Williams
Dl Williams Heating & Cooling Llc
CAC1816913 Class "b" A/c Contractor Subcontractor
Frank Soucinek
Dependable Plumbing
County License & State License & Workers Comp & Employees Workers Comp Expired.
CFC057747 Plumbing Contractor Subcontractor
Darin L Summerlin
Summerlin Roofing,inc.
CCC1326192 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Troy Crews 9/21/2020
Release to power company Troy Crews 9/21/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 9/21/2020
Passed: Building - Slab Troy Crews 9/23/2020
Release to power company Resent The Temporary Power Release Per Contractor Laurie Hodson 9/28/2020
Passed: Building - Wall Sheathing Troy Crews 10/13/2020
Passed: Building - Roof Decking Troy Crews 10/13/2020
Passed: Building - Framing Troy Crews 10/21/2020
Passed: Mechanical - Rough In Troy Crews 10/21/2020
Passed: Plumbing/Gas - 2nd Rough-In Troy Crews 10/21/2020
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 10/21/2020
Passed: Electrical - 2nd Rough-In Troy Crews 10/21/2020
Passed: Building - Insulation Troy Crews 10/22/2020
Passed: Electrical - Permanent Power Need Septic Final Troy Crews 11/12/2020
Release to power company Melissa Garber 11/13/2020
Septic Release Inspection Health Dept 11/13/2020
Failed: Building - Final Need Blower Door Test- Rec'd, Final Termite, Air Handler Needs Drip Pan With Shut Down, Doors Need To Be Sealed, Or Seal Unit And Relocate Filter Troy Crews 12/9/2020
Failed: Building - Final Items On Hvac Not Corrected Troy Crews 12/16/2020
Passed: Building - Final Troy Crews 12/17/2020
Documents