Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 503 NW CAMBRIDGE HILL WAY
LAKE CITY, FL 32055
Parcel #: 01777-121
Acres: 5.08
Owner: Albert & Dianne Nagy
Subdivision: Suwannee Valley Farms Phase 1
Zoning: A-3
Flood Zone: A
District: 1
Application #: 44249
Permit #: 000039125
Related Permit: Culvert: 000039126
Submitted:
Issued: Wednesday, January 8, 2020
Expires: Monday, July 27, 2020
Completed: Monday, July 27, 2020
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION - 102' PER PLAT, NEED ELEVATION CONFIRMATION LETTER AT SLAB, ELEVATION LETTER RECIEVED AT 106.02'.
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1849
Total Area (Sqft) 2634
Stories 1
Building Height 18
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setbacks Rear 25
Septic# 19-0929
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Finished floor requirement 102'
Fema map number 12023C0186D
In floodway N
Review Notes
12/27/2019 Point Review - Received
1/3/2020 Zoning Review - Completed/Sent for Final Review
1/8/2020 Permit Issued Permit # created and approved.
Contractors
Name/ Business License Title Role
Josh Sparks
Sparks Construction
CBC1252260 Building Contractor Contractor
Benjamin L Sparks
Line Electric Company, Llc
EC13009101 Cert. Electrical Subcontractor
Stephen M Brisbois
Epic Ac Service
Workers Comp Expired.
CAC1819412 Cert. A/c Class “b” Subcontractor
Cody Barrs
Barrs Plumbing,inc.
CFC1427145 Plumbing Contractor Subcontractor
Ralph W Laverdure
Rwl Roofing,llc.
CCC1328590 Roofing Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 1/9/2020
Passed: Building - Footer Matt Forsyth 1/10/2020
Passed: Engineering - Setbacks Job Site Needs Portalet Matt Forsyth 1/10/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Tommy Matthews 1/23/2020
Passed: Building - Slab Tommy Matthews 1/28/2020
Passed: Building - Roof Decking Tommy Matthews 2/28/2020
Passed: Building - Ext Strapping/Wall Sheathing Check North Side For Intermediate Spacing. Nails Sunk In Too Deep. Will Renail And Cover. Will Check Again On Next Inspection. Tommy Matthews 2/28/2020
Passed: Electrical - Temporary Service Tommy Matthews 3/5/2020
Release to power company Tommy Matthews 3/5/2020
Failed: Building - Framing Trusses Should Not Be Attached To Porch Bean, Front And Back. Girder Truss Column Detail Requires Httskt At Bottom And Lgt Girder Truss Anchor At Top. garage End Wall Detail Requires Double Bottom Plate And Wall Sheathing On Inside. Trusses Not As Per Permit Set. New Set In Permit Box Dated 2/11/20 Are Used As Permit Set Now. Tommy Matthews 3/5/2020
Passed: Electrical - 2nd Rough-In Tommy Matthews 3/18/2020
Passed: Mechanical - Rough In Tommy Matthews 3/18/2020
Passed: Plumbing/Gas - 2nd Rough-In Tommy Matthews 3/18/2020
Failed: Building - Framing No Items Mentioned In Previous Inspection Were Addressed. If Not Addressed In Next Inspection, There Will Be A $50 Reinspection Fee Required. Tommy Matthews 3/18/2020
Passed: Building - Insulation Tommy Matthews 3/31/2020
Passed: Building - Framing Need Exception For Interior Sheathing Each Side Of Garage Door. Tommy Matthews 3/31/2020
Passed: Electrical - Permanent Power Need Final Septic And Driveway Release Troy Crews 5/11/2020
Passed: Engineering - Final Driveway Smith, Blake 6/25/2020
Release to power company Melissa Garber 6/29/2020
Septic Release Inspection Health Dept 6/29/2020
Passed: Building - Final Need Elevation Certificate And Final Termite Inspection Prior To Co. Both Rec'd. Tommy Matthews 7/20/2020
Certificate-Release Certificate All Needed Doc's Rec'd Tommy Matthews 7/27/2020