Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 237 SW PADDOCK CT
LAKE CITY, FL 32025
Parcel #: 08920-108
Acres: 2.14
Owner: Mf Butler Homes Llc
Subdivision: Briarwood
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 40472
Permit #: 000037859
Related Permit: Culvert: 000002765
Submitted: Wednesday, March 13, 2019
Issued: Wednesday, March 13, 2019
Expires: Friday, October 4, 2019
Completed: Friday, October 4, 2019
Status: Completed
Septic Release? Yes
Notes:
MINIMUM ELEVATION PER PLAT IS 91', NEED ELEVATION LETTER AT SLAB,NOC ON FILE ELEVATION LETTER RECIEVED 92.47 FT.
Job Details
Finished floor requirement
Fema map number 12023C0382D
This is the construction of a SFD, UTILITY
Stories 1
Heated Area (Sqft) 2245.00
Total Area (Sqft) 3209.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 19-0169
Review Notes
Contractors
Name/ Business License Title Role
Mark Bauer

CBC1259633
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Setbacks Tommy Matthews 3/14/2019
Failed: Building - Footer Need Evaluation On Clay Tommy Matthews 3/14/2019
Passed: Engineering - Initial Driveway David Mccormick 3/15/2019
Passed: Electrical - Temporary Service Tommy Matthews 4/9/2019
Release to power company Tommy Matthews 4/9/2019
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 4/16/2019
Passed: Building - Slab Troy Crews 4/18/2019
Passed: Building - Roof Decking Troy Crews 5/20/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/20/2019
Passed: Building - Framing Troy Crews 5/31/2019
Failed: Electrical - Rough In Need Island Power Kitchen Call Back In With Insulation Troy Crews 5/31/2019
Passed: Mechanical - Rough In Troy Crews 5/31/2019
Passed: Plumbing/Gas - Rough In Troy Crews 5/31/2019
Passed: Building - Insulation Troy Crews 6/7/2019
Septic Release Inspection Health Dept 7/12/2019
Passed: Engineering - Final Driveway Mccormick, David 7/17/2019
Passed: Electrical - Permanent Power Tommy Matthews 7/17/2019
Release to power company Tommy Matthews 7/17/2019
Passed: Building - Final Need Picture Of Fresh Air Line For Release, Rec'd Troy Crews 10/4/2019