Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 1095 SW BARNEY STREET
HIGH SPRINGS, FL 32643
Parcel #: 09918-107
Acres: 10.23
Owner: David & Deborah Barnes
Subdivision: Sunnydale Farms
Zoning: A-3
Flood Zone: X
District: 4
Application #: 39701
Permit #: 000037335
Related Permit: Culvert Waiver: 000002687
Submitted: Wednesday, October 17, 2018
Issued: Wednesday, October 17, 2018
Expires: Friday, March 29, 2019
Completed: Friday, March 29, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC ON FILE. REPLACING EXISTING MH WITH SITE BUILT HOME. ENGINEER LETTER REC'D THE FOUNDATION AS CONSTRUCTED AT 98' AND GRADED UPHILL TO THE STRUCTURE WILL PROTECT THE STRUCTURE FROM A BASE FLOOD EVENT. NO OTHER CERTIFICATIONS REQUIRED.
Job Details
Finished floor requirement
Fema map number 12023C0495C
This is the construction of a SFD/UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 1576.00
Total Area (Sqft) 2406.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0810
Review Notes
Contractors
Name/ Business License Title Role
Stuart Amira

CRC1327171
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Stemwall Portion, Finished Floor Elevation Letter Prior To Next Inspection Required No 1foot Above Barney St, 11/1/18 Elevation Ltr Rec'd Troy Crews 10/22/2018
Passed: Engineering - Setbacks Troy Crews 10/22/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 11/6/2018
Passed: Electrical - Temporary Service Troy Crews 11/8/2018
Release to power company Troy Crews 11/8/2018
Cancelled: Building - Slab Troy Crews 11/9/2018
Passed: Building - Slab Tommy Matthews 11/13/2018
Passed: Building - Roof Decking Troy Crews 12/3/2018
Passed: Building - Ext Strapping/Wall Sheathing Porch Post Strapping Also Troy Crews 12/3/2018
Passed: Building - Framing Troy Crews 12/18/2018
Passed: Electrical - Rough In Troy Crews 12/18/2018
Passed: Mechanical - Rough In Troy Crews 12/18/2018
Passed: Plumbing/Gas - Rough In Troy Crews 12/18/2018
Passed: Mechanical - Pipe Pressure Test Troy Crews 12/18/2018
Passed: Building - Insulation Troy Crews 12/21/2018
Passed: Electrical - Permanent Power Need Health Release Troy Crews 1/31/2019
Release to power company Laurie Hodson 2/8/2019
Septic Release Inspection Health Dept 2/8/2019
Failed: Building - Final Outside Receptacles Won’t Trip Indicates Open Ground, Need Handrail On West Side Steps 4 Risers. Troy Crews 3/28/2019
Passed: Building - Final Items Corrected Troy Crews 3/29/2019