Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 691 SE ROSEMARY DR LAKE CITY FL 32024
Parcel #: 02731-098
Acres: 0.36
Owner: The Preserve At Laurel Lakes Inc
Subdivision: Preserve @ Laurel Lk
Zoning: PRD
Flood Zone: X
District: 3
Application #: 38283
Permit #: 000036823
Related Permit: Culvert Waiver: 000002613
Submitted: Thursday, June 7, 2018
Issued: Thursday, June 7, 2018
Expires: Monday, December 17, 2018
Completed: Monday, December 17, 2018
Status: Completed
Septic Release? Yes
Notes:
MINIMUM ELEVATION SET @ 117.8', NEED ELEVATION LETTER AT SLAB NOC ON FILE ELEVATION LETTER REC'D AT 117.8'
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2717.00
Total Area (Sqft) 3675.00
Stories 2
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) X CITY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 6/22/2018
Passed: Engineering - Setbacks Troy Crews 6/22/2018
Passed: Plumbing/Gas - Rough In Waste Only Troy Crews 6/29/2018
Passed: Building - Slab Troy Crews 7/5/2018
Passed: Building - Roof Decking Tommy Matthews 7/26/2018
Passed: Building - Ext Strapping/Wall Sheathing Tommy Matthews 7/26/2018
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 8/13/2018
Passed: Electrical - Rough In Troy Crews 8/14/2018
Passed: Mechanical - Rough In Troy Crews 8/14/2018
Passed: Plumbing/Gas - Rough In Troy Crews 8/14/2018
Failed: Building - Framing Draft Stop Top Of Fireplace Box Troy Crews 8/14/2018
Passed: Building - Framing Draft Stop Installed Troy Crews 8/16/2018
Passed: Building - Insulation Troy Crews 8/20/2018
Failed: Electrical - Permanent Power No Door Locks Ground Wire Loose Ar Service Troy Crews 11/29/2018
Release to power company Troy Crews 12/6/2018
Passed: Electrical - Permanent Power Troy Crews 12/7/2018
Passed: Building - Final Troy Crews 12/14/2018
Documents
File Name Date File Size
Elevation Letter.pdf 2023.12.26 29.25kB
Certificate Of Occupancy.pdf 2023.12.26 141.09kB
Permit-000036823.pdf 2023.12.26 32.20kB