Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 268 NW ETHLIND CT
LAKE CITY, FL 32055
Parcel #: 02377-120
Acres: 0.50
Owner: Habitat For Humanity Of Lc/col. County
Subdivision: Magnolia Hills
Zoning: RSF/MH-2
Flood Zone: X
District: 3
Application #: 37895
Permit #: 000036730
Related Permit: Culvert: 000002600
Submitted: Monday, May 14, 2018
Issued: Monday, May 14, 2018
Expires: Thursday, April 18, 2019
Completed: Thursday, April 18, 2019
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC REC'D.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1248.00
Total Area (Sqft) 1248.00
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0318
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0280D
Review Notes
Contractors
Name/ Business License Title Role
Habitat For Humanity Of Lc/col

OWNERS
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dm 5/16/2018
Passed: Building - Footer Troy Crews 5/22/2018
Passed: Engineering - Setbacks Troy Crews 5/22/2018
Release to power company Re-released For Temp Power. Troy Crews 5/31/2018
Passed: Electrical - Temporary Service Troy Crews 5/31/2018
Release to power company Troy Crews 5/31/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 6/1/2018
Cancelled: Building - Slab Troy Crews 6/1/2018
Passed: Building - Slab Troy Crews 6/4/2018
Passed: Building - Roof Decking Troy Crews 8/8/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 8/8/2018
Failed: Building - Framing Add Clips To T-02 Trusses Troy Crews 10/15/2018
Passed: Electrical - Rough In Troy Crews 10/15/2018
Passed: Mechanical - Rough In Troy Crews 10/15/2018
Failed: Plumbing/Gas - Rough In Need Pressure On Water Lines Troy Crews 10/15/2018
Cancelled: Building - Roof Decking Troy Crews 10/18/2018
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 10/18/2018
Cancelled: Electrical - Rough In Troy Crews 10/18/2018
Cancelled: Mechanical - Framing/Fire Damper Troy Crews 10/18/2018
Failed: Building - Framing Need Extra Straps Left Note On Truss Plans Troy Crews 10/19/2018
Passed: Building - Framing Put Pressure On Water Lines And Call Plumbing In Again Troy Crews 10/30/2018
Septic Release Inspection Health Dept 1/28/2019
Passed: Electrical - Permanent Power Need Driveway Release Troy Crews 2/14/2019
Passed: Electrical - Permanent Power Permanent Power Inspection Already Done Will Call In When Driveway Approved Will Come Back For C.o. When Power Hooked Up Troy Crews 3/22/2019
Passed: Engineering - Final Driveway David Mccormick 3/25/2019
Release to power company Driveway Completed 03.26.19 Troy Crews 3/26/2019
Failed: Building - Final Need Blower Door Test, Final Termite Certificate, Also Washing Machine Plug Needs To Be Single Plug(dedicated) Troy Crews 3/29/2019