Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 243 SW WILSHIRE DR LAKE CITY FL 32024
Parcel #: 03023-397
Acres: 0.50
Owner: Roger Parish
Subdivision: Callaway
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 37600
Permit #: 000036639
Related Permit: Culvert: 000002590
Submitted: Thursday, April 26, 2018
Issued: Thursday, April 26, 2018
Expires: Tuesday, December 4, 2018
Completed: Tuesday, December 4, 2018
Status: Completed
Septic Release? Yes
Notes:
1 FOOT ABOVE ROAD. NOC REC'D.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 1544.00
Total Area (Sqft) 1974.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0307
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0289D
Review Notes
Contractors
Name/ Business License Title Role
Jerry Castagna

County License & State License & Liability Insurance & Workers Comp Expired.
CBC047842
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Tommy Matthews 5/1/2018
Release to power company Tommy Matthews 5/1/2018
Passed: Engineering - Initial Driveway Dm 5/2/2018
Passed: Plumbing/Gas - Rough In Troy Crews 5/21/2018
Passed: Building - Footer Troy Crews 5/24/2018
Passed: Engineering - Setbacks Troy Crews 5/24/2018
Passed: Building - Slab Troy Crews 5/24/2018
Cancelled: Building - Framing Troy Crews 6/15/2018
Passed: Building - Ext Strapping/Wall Sheathing No Strapping Walls Only Troy Crews 6/15/2018
Passed: Building - Framing Troy Crews 7/5/2018
Passed: Electrical - Rough In Troy Crews 7/18/2018
Failed: Mechanical - Rough In Connect Bath Fans Troy Crews 7/18/2018
Passed: Plumbing/Gas - Rough In Troy Crews 7/18/2018
Passed: Mechanical - Rough In Bath Fan Ducts Connected Troy Crews 7/19/2018
Passed: Building - Insulation Troy Crews 7/20/2018
Passed: Electrical - Permanent Power Tommy Matthews 10/3/2018
Passed: Engineering - Final Driveway David Mccormick 10/16/2018
Release to power company Laurie Hodson 10/25/2018
Septic Release Inspection Health Dept 10/25/2018
Failed: Building - Final Need Blower Door Test. need Final Termite Treatment Around Perimeter Of Home. gfi Does Not Work Properly In Kitchen. Tommy Matthews 11/5/2018
Passed: Building - Final Rec'd Blower Door Test 11/29/18 Tommy Matthews 11/28/2018
Documents
File Name Date File Size
36639 Bdt Results 2018-11-28 10.13.05.91.pdf 2023.12.26 773.13kB
Certificate Of Occupancy.pdf 2023.12.26 141.87kB
Permit-36639.pdf 2023.12.26 40.61kB
Permit-000036639.pdf 2023.12.26 40.61kB