Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 238 SW CONNER GLEN LAKE CITY FL 32024
Parcel #: 03605-006
Acres: 6.41
Owner: Brian & Mulholland
Subdivision:
Zoning: A-3
Flood Zone: X
District:
Application #: 36238
Permit #: 000036049
Related Permit: Culvert Waiver: 000002507
Submitted: Thursday, November 30, 2017
Issued: Thursday, November 30, 2017
Expires: Thursday, July 5, 2018
Completed: Thursday, July 5, 2018
Status: Completed
Septic Release? Yes
Notes:
NOC ON FILE. 1 FOOT ABOVE ROAD SEE SFLP 14-18 & PERMIT 32718..SFLP-17-43 Blower door test recieved fresh air vent in place
Job Details
Finished floor requirement
This is the construction of a SFD/UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 2360.00
Total Area (Sqft) 3459.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 17-0716
Review Notes
Contractors
Name/ Business License Title Role
John D. Harrington,jr.

CGC1516998
Inspections
Inspection Notes Performed By Date
Foundation Inspection Tommy Matthews 12/5/2017
Setback Inspection Tommy Matthews 12/5/2017
Passed: Building - Footer Tommy Matthews 12/5/2017
Failed: Electrical - Temporary Service Need Gfi. Remove Loose Wire. Seal Holes At Bottom Of Panel. Tommy Matthews 12/5/2017
Temporary Power Inspection Randy Jones 12/21/2017
Temporary Power Inspection Randy Jones 12/21/2017
Passed: Plumbing/Gas - Underground Rough-In Randy Jones 12/21/2017
Passed: Electrical - Temporary Service Randy Jones 12/21/2017
Release to power company Randy Jones 12/21/2017
Slab Inspection Tommy Matthews 12/27/2017
Passed: Building - Slab Tommy Matthews 12/27/2017
Passed: Building - Lintel/Tie Beam Tommy Matthews 1/24/2018
Passed: Building - Roof Decking Troy Crews 2/7/2018
Passed: Building - Framing Tommy Matthews 3/22/2018
Passed: Electrical - Rough In Tommy Matthews 3/22/2018
Passed: Mechanical - Rough In Tommy Matthews 3/22/2018
Passed: Plumbing/Gas - Rough In Tommy Matthews 3/22/2018
Passed: Building - Insulation Troy Crews 4/2/2018
Passed: Electrical - Permanent Power Troy Crews 6/1/2018
Release to power company Laurie Hodson 6/11/2018
Septic Release Inspection Health Dept 6/11/2018
Passed: Building - Final Release Of C.o Pending Blower Door Test, Rec'd 7.5.18 Troy Crews 6/28/2018
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 7/5/2018
Passed: Building - Final Done On 7-5-18 Blower Door Recieved Troy Crews 7/17/2018