Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 1200 SW BLUFF DRIVE
FT. WHITE, FL 32038
Parcel #: 04236-042
Acres: 1.72
Owner: Charles Ruiz
Subdivision: Cedar Springs Shores
Zoning: ESA-2
Flood Zone: AE
District: 2
Application #: 24917
Permit #: 000025739
Related Permit: Culvert Waiver: 000001372
Submitted: Tuesday, April 24, 2007
Issued: Tuesday, April 24, 2007
Expires: Thursday, March 20, 2008
Completed: Thursday, March 20, 2008
Status: Completed
Septic Release? No
Notes:
ZERO FT RISE LETTER ON FILE, ELEVATION CERTIFICATE RECEIVED NOC ON FILE
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 1368.00
Total Area (Sqft) 1890.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0469C
Review Notes
Contractors
Name/ Business License Title Role
Robert Kelly Construction

CGC007330
Inspections
Inspection Notes Performed By Date
Foundation Inspection Harry Dicks 6/27/2007
Setback Inspection Harry Dicks 6/27/2007
Perimeter Beam/Column Inspection Harry Dicks 7/24/2007
Sheeting and Nailing Inspection Randy Jones 8/17/2007
Sheathing and Nailing Inspection Randy Jones 8/17/2007
Sheathing and Nailing Inspection Randy Jones 8/17/2007
Framing Inspection Harry Dicks 9/20/2007
Rough-In Plumbing Inspection Harry Dicks 9/20/2007
Electrical Rough-In Inspection Harry Dicks 9/20/2007
Heat and Air Duct Inspection Harry Dicks 9/20/2007
Permanent Power Inspection Harry Dicks 1/18/2008
Slab Inspection Wayne Russ 2/26/2008
Final Inspection Harry Dicks 3/20/2008
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 3/24/2008
Documents
File Name Date File Size
Documentation 20200505 093848.pdf 2023.12.21 54.13MB
Certificate Of Occupancy.pdf 2023.12.21 142.38kB
Plans 2020-05-01 11.56.32.708.pdf 2023.12.21 5.84MB