Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 200 NW ANSLEY PL
LAKE CITY, FL 32055
Parcel #: 02202-116
Acres: 4.21
Owner: Tatum Tymber Lee
Subdivision: High Pointe
Zoning: PRRD
Flood Zone: X
District: 3
Application #: 47354
Permit #: 000040771
Related Permit: Culvert: 000040772
Submitted: Wednesday, September 23, 2020
Issued: Thursday, October 22, 2020
Expires: Wednesday, August 11, 2021
Completed: Wednesday, August 11, 2021
Status: Completed
Septic Release? Yes
Notes:
LOMA ON FILE - FLOOD ZONE X HOME BEING BUILT BETWEEN LOTS 15 & 16, WHICH COMBINES THESE LOTS AND CAN NOT BE SEPARATED OR PORTIONS DEEDED OFF OF EITHER LOT.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0280D
In floodway N
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 3445
Total Area (Sqft) 5337
Building Height 13
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 20-0804
Review Notes
9/23/2020 Application pending.
9/23/2020 Point Review - Printed-Online Application
9/25/2020 Zoning Review - Reviewed
9/25/2020 Zoning Review - Reviewed
10/5/2020 Plan Review - Corrections Needed
10/8/2020 Plan Review - Documents Required
10/20/2020 Plan Review - Reviewed
10/20/2020 Zoning Review - Reviewed
10/21/2020 Final Review - Payment Needed
10/22/2020 Permit Issued
7/2/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
David E Hall
David Hall's Air Cond & Heating Svc,inc.
CAC057424 Class B A/c Contractor Subcontractor
David Wood
Wood's Electrical Services Inc
EC13002213 Electrical Contractor Subcontractor
Roger D Whiddon
Whiddon Construction Co Inc
CCC1330273 Roofing Contractor Subcontractor
Matthew Hentzelman
Trademark Construction Group, Inc.
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CCC1329208 Roofing Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 10/23/2020
Failed: Electrical - Temporary Service Wire Not Sized For 30amp Breaker Matt Forsyth 11/6/2020
Passed: Building - Footer Matt Forsyth 11/10/2020
Passed: Engineering - Setbacks Matt Forsyth 11/10/2020
Passed: Electrical - Temporary Service Matt Forsyth 11/10/2020
Release to power company Matt Forsyth 11/10/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 12/2/2020
Passed: Building - Slab Matt Forsyth 12/16/2020
Passed: Building - Lintel/Tie Beam Matt Forsyth 1/6/2021
Rescheduled 3/11/2021:Building - Roof Decking Matt Forsyth 3/11/2021
Passed: Building - Roof Decking Matt Forsyth 3/11/2021
Passed: Building - Framing Matt Forsyth 4/14/2021
Passed: Electrical - 2nd Rough-In Matt Forsyth 4/14/2021
Passed: Mechanical - Rough In Matt Forsyth 4/14/2021
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 4/14/2021
Rescheduled 4/20/2021:Building - Insulation Matt Forsyth 4/19/2021
Passed: Building - Insulation Matt Forsyth 4/20/2021
Septic Release Inspection Health Dept 6/21/2021
Passed: Engineering - Final Driveway Mccormick, David 7/2/2021
Passed: Electrical - Permanent Power Need Driveway Release To Release Power Matt Forsyth 7/2/2021
Passed: Electrical - Permanent Power Matt Forsyth 7/2/2021
Release to power company Matt Forsyth 7/2/2021
Passed: Building - Final Matt Forsyth 8/11/2021