Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 358 SW MARYNIK DR
HIGH SPRINGS, FL 32643
Parcel #: 10006-211
Acres: 5.01
Owner: Buzzerd Christopher, Buzzerd Sabrina
Subdivision: River Rise Residential Unit 1
Zoning: A-3
Flood Zone: X
District: 4
Application #: 47473
Permit #: 000040739
Related Permit: Culvert: 000040740
Submitted: Thursday, October 8, 2020
Issued: Tuesday, November 10, 2020
Expires: Thursday, May 27, 2021
Completed: Thursday, May 27, 2021
Status: Completed
Septic Release? Yes
Notes:
11/10/2020 - ENGINEER ELEVATION LETTER REC'D THE MINIMUM FLOOR ELEVATION SHALL BE 97.00'. NEED SURVEYOR FINISHED FLOOR ELEVATION LETTER AT SLAB. PERMIT UPDATED WITH NEW ELEVATION REQUIREMENTS. SURVEYOR ELEVATION CONFIRMATION LETTER REC'D AT 98.5' AND 98'.
Job Details
Finished floor requirement
Fema map number 12023C0490C
Type Roofing Job Re-Cover - New Material over Existing
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 1600
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Explain if not removing the existing roofing material? installing metal roof over shingles using perlins
Type of New Roofing Product Metal
Florida Product Approval Number FL36904
Product Manufacturer Tri County Metal
Product Description 29g ultra rib metal w/color
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. single layer slip sheet
Ventilation: Off-ridge Vent
Flashing: Use Existing
Drip Edge: Use Existing
Valley Treatment: Use Existing
Review Notes
10/7/2020 Application pending.
10/8/2020 Point Review - On Hold-Incomplete
10/9/2020 Point Review - Printed-Online Application
10/14/2020 Zoning Review - Reviewed
10/19/2020 Plan Review - Reviewed
10/20/2020 Zoning Review - Reviewed
10/20/2020 Permit Issued
11/10/2020 Permit reissued to reflect updated information.
3/31/2021 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Stuart L Amira
Amira Builders, Inc.
CRC1327171 Cert. Residential Contractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
David J Pabst
Whittle Roofing Company, Inc.
Workers Comp & Employees Workers Comp Expired.
CCC1326372 Cert. Roofing Subcontractor
Ryan C Beville
Rbi Electrical Contracting Llc
EC13004236 Electrical Contractor Subcontractor
Robert M Bounds
Bounds Heating & Air Inc
CAC057642 Class A A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 10/20/2020
Passed: Plumbing/Gas - 1st Underground Rough–In Troy Crews 11/18/2020
Passed: Electrical - Temporary Service Troy Crews 11/18/2020
Release to power company Troy Crews 11/18/2020
Passed: Building - Monolithic Slab Troy Crews 11/25/2020
Passed: Engineering - Setbacks Troy Crews 11/25/2020
Passed: Electrical - 1st Underground Rough–In Troy Crews 11/25/2020
Passed: Building - Wall Sheathing Still Working On Garage Anthony Aslan 12/31/2020
Passed: Building - Roof Decking Partial Release, Call Back In For Garage. Anthony Aslan 12/31/2020
Passed: Building - Roof Decking Partial Garage Roof Anthony Aslan 1/4/2021
Passed: Building - Framing Inspected Strapping And Flashing. Anthony Aslan 1/14/2021
Passed: Electrical - 2nd Rough-In Anthony Aslan 2/4/2021
Failed: Plumbing/Gas - 2nd Rough-In No Pressure On Gauge. Anthony Aslan 2/4/2021
Failed: Mechanical - Rough In Need Screws In Kitchen Exhaust Hood Pipe Seams, Dryer Elbow Does Not Have 1" Insertion On Top Or Bottom Seam And Dryer Pipe Can Not Be Oval-shaped In Wall, Wall Needs To Be Furr Out Wall. Anthony Aslan 2/4/2021
Passed: Plumbing/Gas - 2nd Rough-In Pressure Reading At Gauge 52psi Anthony Aslan 2/5/2021
Passed: Mechanical - Rough In First Seam On Dryer Needs More Tape And Tape At Bottom Of Elbow Needs To Be Squeegeed Down. Anthony Aslan 2/5/2021
Passed: Building - Insulation Anthony Aslan 2/12/2021
Septic Release Inspection Health Dept 3/23/2021
Failed: Electrical - Permanent Power Storage Above Garage Light Box No Wire Nuts, Need Drive Way Release. Anthony Aslan 4/1/2021
Passed: Electrical - Permanent Power Need Driveway Release Anthony Aslan 4/5/2021
Passed: Engineering - Final Driveway Mccormick, David 4/6/2021
Release to power company Melissa Garber 4/7/2021
Passed: Building - Final Anthony Aslan 5/27/2021