Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Culvert Permit
Address 322 SW TIMBERLAND CT
LAKE CITY, FL 32024
Parcel #: 02438-188
Acres: 0.50
Owner: Maximum Real Estate Llc
Subdivision: Emerald Cove Phase 2
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 46809
Permit #: 000040254
Related Permit: New Residential Construction: 000040253
Submitted: Monday, July 20, 2020
Issued: Thursday, July 30, 2020
Expires: Wednesday, November 25, 2020
Completed: Wednesday, November 25, 2020
Status: Completed
Septic Release? na
Notes:

Job Details
Building Permit # 000040253
Standards Shall conform to Public Works Determinations as stated below
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Elevation regulation Subdivision Plat
Finished floor requirement 102'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Fema map number 12023C0290D
In floodway N
Review Notes
7/24/2020 Final Review - Payment Needed
7/30/2020 Permit Issued Permit #000040254 created and approved.
Contractors
Name/ Business License Title Role
Mark Bauer
Gibraltar Contracting Llc
County License & State License & Liability Insurance & Employees Workers Comp Expired.
CBC1259633 Cert Building Contractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Mccormick, David 7/30/2020
Passed: Engineering - Final Driveway Mccormick, David 11/25/2020
Documents
File Name Date File Size
Original Permit 20200730.pdf 2023.12.26 134.76kB