Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Culvert Permit
Address 445 SW HEATHRIDGE DR
LAKE CITY, FL 32024
Parcel #: 02438-109
Acres: 0.50
Owner: Mf Butler Homes. Llc
Subdivision: Emerald Cove Phase 1
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 46113
Permit #: 000039690
Related Permit: New Residential Construction: 000039689
Submitted: Tuesday, April 28, 2020
Issued: Tuesday, April 28, 2020
Expires: Monday, August 10, 2020
Completed: Monday, August 10, 2020
Status: Completed
Septic Release? na
Notes:
SUBDIVISION PLAT SHOWS A 20' DRAINAGE EASEMENT LOCATED DOWN THE EAST LOT LINE THAT MUST REMAIN TO THE RETENTION AREA LOCATED BEHIND THIS PROPERTY.
Job Details
Building Permit # 000039689
Requirements Install min, 32 ' × 18 " corr metal culvert w / concrete mitred ends, w / 6 " × 6 " welded wire, rebar or culvert bolts in mitred ends, concrete mitred ends W - 4ft x L - 5ft, and with 4 inches of limerock on top cover.
Status Approved
Elevation regulation Subdivision Plat
Finished floor requirement 103'
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Fema map number 12023C0280D
Review Notes
4/28/2020 Permit Issued Permit #000039690 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Cancelled: Engineering - Initial Driveway Melissa Garber 4/28/2020
Passed: Engineering - Initial Driveway Mccormick, David 4/29/2020
Passed: Engineering - Final Driveway Mccormick, David 8/10/2020
Documents
File Name Date File Size
Original Permit 20200428.pdf 2023.12.26 134.70kB