Inspection |
Notes |
Performed By |
Date |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Matt Forsyth |
12/13/2019 |
Passed: Building - Slab |
|
Matt Forsyth |
12/17/2019 |
Passed: Electrical - Temporary Service |
|
Troy Crews |
12/30/2019 |
Release to power company |
|
Troy Crews |
12/30/2019 |
Passed: Building - Ext Strapping/Wall Sheathing |
Wall Strapping Not Installed. Will Look At It At Roof Sheathing Inspection. No More Scheduled Inspections Permitted Until Elevation Confirmation Letter Received And Approved. |
Tommy Matthews |
1/6/2020 |
Passed: Building - Roof Decking |
|
Tommy Matthews |
1/23/2020 |
Passed: Building - Framing |
|
Matt Forsyth |
2/5/2020 |
Passed: Electrical - 2nd Rough-In |
|
Tommy Matthews |
2/25/2020 |
Failed: Mechanical - Rough In |
Exhaust Fan In Master Bath Not Ducted (toilet Area). |
Tommy Matthews |
2/25/2020 |
Passed: Plumbing/Gas - 2nd Rough-In |
|
Tommy Matthews |
2/25/2020 |
Passed: Mechanical - Rough In |
|
Tommy Matthews |
3/4/2020 |
Passed: Building - Insulation |
|
Tommy Matthews |
3/4/2020 |
Failed: Electrical - Permanent Power |
Need Garage Door Installed For Safety. Panel Box In Garage. Need Septic Final. Could Not Get Access To Inside For Inspection. |
Tommy Matthews |
5/21/2020 |
Septic Release Inspection |
|
Health Dept |
5/29/2020 |
Passed: Electrical - Permanent Power |
Need Culvert Final |
Tommy Matthews |
6/3/2020 |
Passed: Engineering - Final Driveway |
|
Smith, Blake |
6/23/2020 |
Release to power company |
|
Tommy Matthews |
6/24/2020 |
Failed: Building - Final |
Showers Not Working And Final Termite Document-rec'd Termite 9/9/20 |
Matt Forsyth |
8/28/2020 |
Passed: Building - Final |
|
Matt Forsyth |
9/11/2020 |