Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 158 SW GREAT OAK CT
LAKE CITY, FL 32024
Parcel #: 02439-104
Acres: 0.31
Owner: Gary Sorensen
Subdivision: The Reserve At Jewel Lake
Zoning: PRD
Flood Zone: X
District: 3
Application #: 42022
Permit #: 000038238
Related Permit: Culvert Waiver: 000002827
Submitted: Monday, June 17, 2019
Issued: Monday, June 17, 2019
Expires: Monday, March 23, 2020
Completed:
Status:
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION PER PLAT IS 153', NEED ELEVATION LETTER AT SLAB, NOC ON FILE,***STRING FRONT PROPERTY LINE FOR INSPECTION***, ELEVATION LETTER REC'D AT 154.92'
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1376.00
Total Area (Sqft) 1806.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# X-CITY
Power Company FPL
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Gerald Smith Sr

County License & State License & Liability Insurance Expired.
CBC1254161
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 6/19/2019
Passed: Engineering - Setbacks Troy Crews 6/19/2019
Passed: Plumbing/Gas - Rough In Troy Crews 6/27/2019
Passed: Building - Slab Troy Crews 7/1/2019
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 7/16/2019
Passed: Building - Roof Decking Troy Crews 7/16/2019
Failed: Plumbing/Gas - Rough In Not Ready Troy Crews 7/18/2019
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 7/19/2019
Failed: Building - Framing All Loadbearing Headers And Beams Need Nailing At Each Edge (top An Bot.) At 12in Oc > 4ft. And 16in Oc < 4ft. Matt Forsyth 7/26/2019
Passed: Electrical - Rough In Matt Forsyth 7/26/2019
Passed: Mechanical - Rough In Matt Forsyth 7/26/2019
Passed: Building - Framing Matt Forsyth 7/29/2019
Passed: Building - Insulation Blown Attic Matt Forsyth 7/29/2019
Passed: Electrical - Permanent Power Tommy Matthews 8/29/2019
Release to power company Tommy Matthews 8/29/2019
Passed: Building - Final Troy Crews 9/25/2019
Documents
File Name Date File Size
Elevation Letter 2019-07-26 9.02.58 Am (addendum).pdf 2023.12.26 34.74kB