Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 335 SW ARROWBEND DR
LAKE CITY, FL 32024
Parcel #: 03114-128
Acres: 0.52
Owner: Mf Butler Homes, Llc
Subdivision: Cannon Creek Place
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 40858
Permit #: 000038115
Related Permit: Culvert: 000002809
Submitted: Tuesday, May 14, 2019
Issued: Tuesday, May 14, 2019
Expires: Wednesday, December 11, 2019
Completed: Wednesday, December 11, 2019
Status: Completed
Septic Release? Yes
Notes:
NOC ON FILE. MFE @ 98.00' PER PLAT. NEED ELEVATION CONFIRMATION LETTER AT SLAB. ELEVATION LETTER REC'D AT 98.47'.
Job Details
Finished floor requirement
Fema map number 12023C0381D
This is the construction of a SFD/UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 1
Heated Area (Sqft) 1789.00
Total Area (Sqft) 2447.00
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title Single Family Dwelling
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 19-0368
Review Notes
Contractors
Name/ Business License Title Role
Mark Bauer

CBC1259633
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway David Mccormick 5/14/2019
Passed: Building - Footer Tommy Matthews 5/17/2019
Passed: Engineering - Setbacks Tommy Matthews 5/17/2019
Passed: Electrical - Temporary Service Matt Forsyth 5/24/2019
Release to power company Matt Forsyth 5/24/2019
Passed: Plumbing/Gas - Underground Rough-In Matt Forsyth 5/24/2019
Passed: Building - Slab Matt Forsyth 6/3/2019
Passed: Building - Roof Decking Matt Forsyth 7/5/2019
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 7/5/2019
Passed: Building - Framing Matt Forsyth 7/22/2019
Passed: Electrical - Rough In Matt Forsyth 7/22/2019
Passed: Mechanical - Rough In Matt Forsyth 7/22/2019
Passed: Plumbing/Gas - Rough In Matt Forsyth 7/22/2019
Passed: Building - Insulation Attic Will Be Blown Insulation Matt Forsyth 7/24/2019
Passed: Engineering - Final Driveway Mccormick, David 10/2/2019
Passed: Electrical - Permanent Power Need Septic Release And Driveway Release. Tommy Matthews 10/2/2019
Release to power company Lh 10/9/2019
Septic Release Inspection Health Dept 10/9/2019
Failed: Building - Final Lock Box Code Did Not Work Matt Forsyth 12/11/2019
Passed: Building - Final Matt Forsyth 12/12/2019