Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 432 SW ROSEMARY DR LAKE CITY FL 32024
Parcel #: 02731-004
Acres: 0.25
Owner: The Preserve At Laurel Lakes Inc
Subdivision: Preserve @ Laurel Lk
Zoning: PRD
Flood Zone: X
District: 3
Application #: 38285
Permit #: 000036824
Related Permit: Culvert Waiver: 000002614
Submitted: Thursday, June 7, 2018
Issued: Thursday, June 7, 2018
Expires: Wednesday, January 30, 2019
Completed: Wednesday, January 30, 2019
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION SET @ 116.2', NEED ELEVATION LETTER AT SLAB NOC ON FILE, ELEVATION LETTER REC'D AT 116.7' Porch beams and strapping in file , Blower door test recieved
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2246.00
Total Area (Sqft) 3196.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# X-CITY
Power Company FPL
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 6/25/2018
Passed: Engineering - Setbacks Troy Crews 6/25/2018
Passed: Plumbing/Gas - Underground Rough-In Waste Only Troy Crews 7/2/2018
Passed: Building - Slab Troy Crews 7/9/2018
Passed: Building - Roof Decking Troy Crews 7/31/2018
Cancelled: Building - Roof Decking Troy Crews 8/13/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 8/14/2018
Passed: Building - Framing Troy Crews 8/14/2018
Failed: Electrical - Rough In Smoke Detector Too Close To Ac Vent S.e.bedroom Troy Crews 8/14/2018
Passed: Mechanical - Rough In Troy Crews 8/14/2018
Passed: Plumbing/Gas - Rough In Troy Crews 8/14/2018
Passed: Electrical - Rough In Vent Moved Away From Smoke Detector Troy Crews 8/16/2018
Passed: Building - Insulation Troy Crews 8/20/2018
Failed: Electrical - Permanent Power Need Garage Door And Door Locks Troy Crews 11/15/2018
Release to power company Troy Crews 1/18/2019
Passed: Electrical - Permanent Power Troy Crews 1/22/2019
Passed: Building - Final Check G.f.c.i. On Back Porch Won’t Reset Troy Crews 1/31/2019