Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 299 SW NEWLYWED CT LAKE CITY FL 32024
Parcel #: 02973-114
Acres: 0.50
Owner: Adam's Construction
Subdivision: Hunnington Place
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 37954
Permit #: 000036756
Related Permit: Culvert: 000002606
Submitted: Thursday, May 17, 2018
Issued: Thursday, May 17, 2018
Expires: Monday, September 24, 2018
Completed: Monday, September 24, 2018
Status: Completed
Septic Release? Yes
Notes:
FLOOR ONE FOOT ABOVE THE ROAD, NOC ON FILE, rec'd blower door test results 9/21/18 Termite cert. RECEIVED
Job Details
Finished floor requirement
Fema map number 12023C0290D
Standards Shall conform to Public Works Determinations as stated below
Requirements An 18” storm pipe of approved material is required with a minimum length of 24 feet with 4 inches Limerock for cover
Status Permanent
Type of connection for access road Drainage
Type of construction of property Mobile Home
Normal vehicle usage: Automobiles
Side Drain required Yes
Side Drain Size 18
Study Required No
Estimated Number of Vehicle trips per day 1
Is the access for commercial or residential use? Residential
County Road Type Unpaved
Review Notes
Contractors
Name/ Business License Title Role
Adam Papka

County License & State License & Liability Insurance & Workers Comp Expired.
CBC1253409
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 5/23/2018
Passed: Engineering - Setbacks Troy Crews 5/23/2018
Cancelled: Electrical - Temporary Service Troy Crews 5/23/2018
Passed: Electrical - Footer Steel & Grounding Troy Crews 5/23/2018
Passed: Engineering - Initial Driveway Dm 5/24/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 5/30/2018
Release to power company Troy Crews 5/31/2018
Passed: Building - Slab Troy Crews 6/1/2018
Passed: Electrical - Temporary Service Troy Crews 6/1/2018
Passed: Building - Ext Strapping/Wall Sheathing Walls Only No Strapping Roof To Be Done Monday Troy Crews 6/18/2018
Passed: Building - Roof Decking Tommy Matthews 6/18/2018
Passed: Electrical - Rough In Troy Crews 7/10/2018
Failed: Building - Framing Add Studs Under All Girder Trusses,tempered Glass Needs To Be Moved At Rear Door Troy Crews 7/10/2018
Passed: Mechanical - Rough In Troy Crews 7/10/2018
Passed: Plumbing/Gas - Rough In Repair Cut Out Vent And Add Pressure To Water Lines Troy Crews 7/10/2018
Failed: Building - Framing Items Not Corrected 50$ Reinspection Fee Will Apply Troy Crews 7/12/2018
Failed: Plumbing/Gas - Rough In Items Not Corrected Troy Crews 7/12/2018
Passed: Building - Framing Items Corrected Troy Crews 7/16/2018
Passed: Building - Insulation Troy Crews 7/16/2018
Passed: Plumbing/Gas - Rough In Troy Crews 7/16/2018
Passed: Electrical - Permanent Power Need Health Release & Final On Driveway Troy Crews 8/29/2018
Release to power company Laurie Hodson 8/30/2018
Passed: Engineering - Final Driveway David Mccormick 8/30/2018
Septic Release Inspection Health Dept 8/30/2018
Passed: Engineering - Final Driveway David Mccormick 9/19/2018
Failed: Building - Final Need Final Termite Certification Troy Crews 9/24/2018
Passed: Building - Final Troy Crews 9/24/2018
Documents
File Name Date File Size