Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 177 SW PADDOCK CT LAKE CITY FL 32024
Parcel #: 08920-109
Acres: 2.01
Owner: Mf Butler Homes Llc
Subdivision: Briarwood
Zoning: A-3
Flood Zone: X
District: 5
Application #: 37690
Permit #: 000036673
Related Permit: Culvert: 000002593
Submitted: Tuesday, May 1, 2018
Issued: Tuesday, May 1, 2018
Expires: Thursday, September 13, 2018
Completed: Thursday, September 13, 2018
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION SET BY PLAT TO 89', NEED ELEVATION LETTER AT SLAB, NOC ON FILE, ELEVATION LETTER REC'D AT 91.60' Blower door test recieved
Job Details
Finished floor requirement
Fema map number 12023C0382D
This is the construction of a SFD, UTILITY
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Stories 1
Heated Area (Sqft) 2145.00
Total Area (Sqft) 3128.00
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Septic# (00-0000) or (X00-000) 18-0278
Review Notes
Contractors
Name/ Business License Title Role
Mark Bauer

CBC1259633
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Tommy Matthews 5/3/2018
Passed: Engineering - Setbacks Need Porti Potti Asap Tommy Matthews 5/3/2018
Passed: Engineering - Initial Driveway David Mccormick 5/4/2018
Passed: Plumbing/Gas - Rough In Tommy Matthews 5/11/2018
Release to power company Troy Crews 5/15/2018
Passed: Electrical - Temporary Service Troy Crews 5/16/2018
Passed: Building - Slab Contractor Uses Termite Bait System Troy Crews 5/17/2018
Passed: Building - Roof Decking Troy Crews 6/6/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 6/6/2018
Rescheduled 6/19/2018:Building - Framing Rescheduled Laurie Hodson 6/18/2018
Rescheduled 6/19/2018:Electrical - Rough In Rescheduled Laurie Hodson 6/18/2018
Rescheduled 6/19/2018:Mechanical - Rough In Rescheduled Laurie Hodson 6/18/2018
Rescheduled 6/19/2018:Plumbing/Gas - Rough In Rescheduled Laurie Hodson 6/18/2018
Passed: Building - Framing Troy Crews 6/19/2018
Passed: Electrical - Rough In Troy Crews 6/19/2018
Passed: Mechanical - Rough In Troy Crews 6/19/2018
Passed: Plumbing/Gas - Rough In Troy Crews 6/19/2018
Passed: Building - Insulation Troy Crews 6/27/2018
Septic Release Inspection Health Dept 8/6/2018
Cancelled: Electrical - Permanent Power Need Elevation Letter, Elevation Letter Rec'd 8/23/18 Troy Crews 8/17/2018
Passed: Electrical - Permanent Power Troy Crews 8/24/2018
Release to power company Troy Crews 8/24/2018
Passed: Engineering - Final Driveway David Mccormick 8/27/2018
Passed: Building - Final Check Master Bath Gfci And Gfci By Air Condenser Troy Crews 9/12/2018
Passed: Building - Final Done On 9-12-18 Troy Crews 12/7/2018