Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 457 SW MAYFAIR LN LAKE CITY FL 32024
Parcel #: 02911-333
Acres: 0.51
Owner: Trent Giebeig Construction Inc
Subdivision: Mayfair
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 37555
Permit #: 000036618
Related Permit: Culvert: 000002585
Submitted: Tuesday, April 24, 2018
Issued: Tuesday, April 24, 2018
Expires: Monday, August 6, 2018
Completed: Monday, August 6, 2018
Status: Completed
Septic Release? Yes
Notes:
MINIMUM FLOOR ELEVATION SET BY PLAT AT 146.5', NEED ELEVATION CONFIRMATION LETTER AT SLAB, NOC ON FILE ELEVATION LETTER REC'D AT 147.29'
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 1600.00
Total Area (Sqft) 2186.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# 18-0239
Power Company CLAY
Building Code Edition Florida Building Code 2017 6th Edition & 2014 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Trent Giebeig

CRC1330693
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Tommy Matthews 4/27/2018
Passed: Engineering - Setbacks Tommy Matthews 4/27/2018
Failed: Electrical - Temporary Service Tommy Matthews 4/27/2018
Passed: Engineering - Initial Driveway Dm 4/30/2018
Passed: Plumbing/Gas - Underground Rough-In Tommy Matthews 5/1/2018
Passed: Electrical - Temporary Service Troy Crews 5/3/2018
Release to power company Troy Crews 5/3/2018
Passed: Building - Slab Troy Crews 5/3/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/23/2018
Passed: Building - Framing Troy Crews 6/12/2018
Passed: Electrical - Rough In Troy Crews 6/12/2018
Passed: Mechanical - Rough In Troy Crews 6/12/2018
Passed: Plumbing/Gas - Tub Set/Shower Pan Troy Crews 6/12/2018
Passed: Building - Insulation Troy Crews 6/14/2018
Passed: Engineering - Final Driveway Dm 7/12/2018
Passed: Electrical - Permanent Power Need Health Release Troy Crews 7/12/2018
Septic Release Inspection ,need Culvert Final (2585), Rec'd 7/16/18 Health Dept 7/12/2018
Release to power company All Releases Rec'd 7/16/18 Laurie Hodson 7/16/2018
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 7/30/2018
Passed: Building - Final Troy Crews 7/30/2018
Documents
File Name Date File Size
Blower Door Test.pdf 2023.12.26 110.57kB
Certificate Of Occupancy.pdf 2023.12.26 141.08kB
Permit-36618.pdf 2023.12.26 43.31kB
Permit-000036618.pdf 2023.12.26 43.31kB
Elevation Letter.pdf 2023.12.26 26.91kB