Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 614 SW BELLFLOWER DR LAKE CITY FL 32024
Parcel #: 02731-047
Acres: 0.27
Owner: Preserve At Laurel Lake
Subdivision: Preserve @laurel Lk
Zoning: PRD
Flood Zone: X
District: 3
Application #: 36976
Permit #: 000036409
Related Permit: Culvert Waiver: 000002559
Submitted: Monday, March 5, 2018
Issued: Monday, March 5, 2018
Expires: Friday, August 31, 2018
Completed: Friday, August 31, 2018
Status: Completed
Septic Release? Yes
Notes:
NOC ON FILE, MINIMUM FLOOR ELEVATION SET AT 106.5', NEED ELEVATION LETTER AT SLAB, ELEVATION LETTER RC'D AT 106.6'
Job Details
Elevation regulation Accessory Use
Finished floor requirement Non-Habitable Structure
Fema map number 12023C0270C
In floodway N
Type of Structure Garage
Commercial or Residential? Residential
Total Area (Sqft) 1050
Septic# (00-0000) or (X00-000) 21-0959
Setbacks Front 30
Setback Side 1 25
Setback Side 2 25
Setback Rear 25
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Storage
Dev Permit # F023-
Building Code Edition 2020 Florida Building Code 7th Edition and 2017 National Electrical Code
Building Height 20
Length 30
Width 35
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License & Liability Insurance & Workers Comp Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Troy Crews 3/8/2018
Passed: Engineering - Setbacks Troy Crews 3/8/2018
Passed: Plumbing/Gas - Underground Rough-In Troy Crews 4/9/2018
Passed: Building - Slab Troy Crews 4/10/2018
Cancelled: Building - Roof Decking Troy Crews 5/2/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/3/2018
Cancelled: Building - Ext Strapping/Wall Sheathing Troy Crews 5/14/2018
Passed: Building - Roof Decking Troy Crews 5/14/2018
Cancelled: Building - Roof Decking Troy Crews 5/15/2018
Passed: Building - Ext Strapping/Wall Sheathing Troy Crews 5/15/2018
Passed: Building - Framing Troy Crews 5/15/2018
Passed: Mechanical - Rough In Troy Crews 5/30/2018
Failed: Electrical - Rough In Not Started Troy Crews 5/30/2018
Failed: Plumbing/Gas - Rough In Not Started Troy Crews 5/30/2018
Cancelled: Building - Framing Troy Crews 6/6/2018
Passed: Electrical - Rough In Troy Crews 6/7/2018
Passed: Mechanical - Rough In Troy Crews 6/7/2018
Passed: Plumbing/Gas - Rough In Troy Crews 6/7/2018
Failed: Electrical - Permanent Power Need Insulation Letter From Insulation Contractor. And Request Insulation Inspection. Troy Crews 8/14/2018
Passed: Building - Insulation Letter Rec'd 8/14/18 Troy Crews 8/14/2018
Failed: Electrical - Permanent Power Need Garage Door Troy Crews 8/14/2018
Release to power company Troy Crews 8/15/2018
Passed: Electrical - Permanent Power Garage Door Installed Troy Crews 8/16/2018
Failed: Building - Final Need Step In Garage,termite Final, Blower Door Test Troy Crews 8/24/2018
Passed: Building - Final Blower Door Test Recieved, Step Installed In Garage Troy Crews 8/30/2018
Documents
File Name Date File Size