Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 350 SW SILVER PALM DR LAKE CITY FL 32024
Parcel #: 02731-072
Acres: 0.25
Owner: The Preserve At Laurel Lake Inc
Subdivision: Preserve At Laurel Lake
Zoning: PRD
Flood Zone: X
District: 3
Application #: 25503
Permit #: 000035104
Related Permit: Culvert Waiver: 000002393
Submitted: Saturday, March 18, 2017
Issued: Saturday, March 18, 2017
Expires: Monday, December 4, 2017
Completed: Monday, December 4, 2017
Status: Completed
Septic Release? No
Notes:
MINIMUM FLOOR ELEVATION SET AT 118.4' PER PLAT, NEED ELEVATION CONFIRMATION LETTER AT SLAB,ELEVATION CONFIRMATION LETTER REC'D 119.3' NOC REC'D.
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2000.00
Total Area (Sqft) 2812.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) CITY
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0290D
Review Notes
Contractors
Name/ Business License Title Role
Aaron Simque

County License & State License Expired.
R282811879
Inspections
Inspection Notes Performed By Date
Foundation Inspection Tommy Matthews 4/10/2017
Setback Inspection Tommy Matthews 4/11/2017
Underslab Rough Plumbing Inspection Troy Crews 5/4/2017
Sheathing and Nailing Inspection Troy Crews 6/27/2017
Framing Inspection Tommy Matthews 7/11/2017
Rough-In Plumbing Inspection Tommy Matthews 7/11/2017
Electrical Rough-In Inspection Tommy Matthews 7/11/2017
Heat and Air Duct Inspection Tommy Matthews 7/11/2017
Insulation Inspection Troy Crews 7/20/2017
Permanent Power Inspection Troy Crews 10/26/2017
Final Inspection 12/4/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 12/4/2017
Final Inspection Troy Crews 12/4/2017
Passed: Building - Final Troy Crews 12/4/2017
(Requested) Perm Power
Documents
File Name Date File Size
Permit-35104.pdf 2023.12.21 461.17kB
Permit-000035104.pdf 2023.12.21 461.17kB
Certificate Of Occupancy.pdf 2023.12.21 141.09kB