Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 389 SW UPSTAGE GLN LAKE CITY FL 32024
Parcel #: 09280-150
Acres: 5.46
Owner: Michelle L. Dorcas
Subdivision: Oaks Of Lake City
Zoning: PRRD
Flood Zone: X
District: 5
Application #: 20949
Permit #: 000035097
Related Permit: Culvert: 000002391
Submitted: Tuesday, March 28, 2017
Issued: Tuesday, March 28, 2017
Expires: Thursday, September 14, 2017
Completed: Thursday, September 14, 2017
Status: Completed
Septic Release? No
Notes:
MFE @ 81.00'. SFD IS IN ZONE X. NOC ON FILE. ELEVATION CONFIRMATION LETTER REC'D @ 85.16' SLAB PORCHES.04.20.17-TC
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2364.00
Total Area (Sqft) 3594.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# (00-0000) or (X00-000) 17-0129-N
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0395C
Review Notes
Contractors
Name/ Business License Title Role
Bryan Zecher
Bryan Zecher Construction, Inc.
CBC054575 Cert.building Contractor
Inspections
Inspection Notes Performed By Date
Foundation Inspection Troy Crews 3/29/2017
Setback Inspection Troy Crews 3/29/2017
Passed: Engineering - Initial Driveway Dm 3/31/2017
Temporary Power Inspection Tommy Matthews 4/11/2017
Rough-In Plumbing Inspection Tommy Matthews 4/11/2017
Slab Inspection Troy Crews 4/17/2017
Sheathing and Nailing Inspection Troy Crews 5/10/2017
Framing Inspection 6/14/2017
Electrical Rough-In Inspection Tommy Matthews 6/14/2017
Heat and Air Duct Inspection Tommy Matthews 6/14/2017
Permanent Power Inspection Troy Crews 8/1/2017
Passed: Engineering - Final Driveway Dm 8/10/2017
Final Inspection 9/14/2017
Final Inspection Troy Crews 9/14/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 9/15/2017
(Requested) Under Slab Rough-in
(Requested) Slab
Documents
File Name Date File Size
Permit-35097.pdf 2023.12.21 431.88kB
Certificate Of Occupancy.pdf 2023.12.21 138.05kB
Permit-000035097.pdf 2023.12.21 431.88kB