Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 475 NW HIGH POINT DR LAKE CITY FL 32055
Parcel #: 02202-129
Acres: 1.89
Owner: Brown Road Properties Inc
Subdivision: High Pointe Farms
Zoning: PRD
Flood Zone: X
District: 3
Application #: 25491
Permit #: 000034796
Related Permit: Culvert: 000002366
Submitted: Tuesday, January 3, 2017
Issued: Tuesday, January 3, 2017
Expires: Thursday, May 25, 2017
Completed: Thursday, May 25, 2017
Status: Completed
Septic Release? No
Notes:
WHICHEVER IS GREATER OF THESE TWO EITHER ONE FOOT ABOVE THE HIGHEST ADJACENT GRADE OR ONE FOOT ABOVE SW ANSLEY PLACE NOC ON FILE, ELEVATION LETTER REC'D INSULATION.03.06.17-TC/TM
Job Details
This is the construction of a SFD, UTILITY
Heated Area (Sqft) 2307.00
Total Area (Sqft) 3201.00
Stories 1
Setbacks Front 30.00
Setback Side 1 25.00
Setback Side 2 25.00
Setbacks Rear 25.00
Septic# 16-0689-N
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0280D
Review Notes
Contractors
Name/ Business License Title Role
Isaac Nickleson
Premier Building,llc
County License & State License & Liability Insurance & Workers Comp & Employees Workers Comp Expired.
CBC1258773 Building Contractor
Inspections
Inspection Notes Performed By Date
Underslab Rough Plumbing Inspection Troy Crews 1/9/2016
Temporary Power Inspection Troy Crews 1/12/2017
Monolithic Slab Inspection Troy Crews 1/17/2017
Setback Inspection Troy Crews 1/17/2017
Sheathing and Nailing Inspection Troy Crews 2/17/2017
Rough-In Plumbing Inspection Troy Crews 2/28/2017
Electrical Rough-In Inspection Troy Crews 2/28/2017
Framing Inspection Troy Crews 3/2/2017
Heat and Air Duct Inspection Troy Crews 3/2/2017
Permanent Power Inspection Tommy Matthews 4/10/2017
Passed: Engineering - Initial Driveway Dm 4/11/2017
Passed: Engineering - Final Driveway Dm 5/22/2017
Final Inspection 5/25/2017
Final Inspection Tommy Matthews 5/25/2017
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 5/25/2017
(Requested) Under Slab Rough-in
(Requested) Temp Power-Under Ground
(Requested) Mono Slab
(Requested) Sheathing/Nailing-Roof & Wall
(Requested) Electrical Rough-in
(Requested) Heat & AC-Rough-in/Duct
(Requested) Framing
(Requested) Heat & AC-Rough-in/Duct
(Requested) Insulation
(Requested) Perm Power-Electrical Final
(Requested) Perm Power-Electrical Final
(Requested) Final-Certificate of Occupancy
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.21 138.06kB