Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 185 NW MEADOWLARK DR LAKE CITY FL 32055
Parcel #: 05842-103
Acres: 0.50
Owner: Sunshine Properties Group,llc
Subdivision: Sunset Meadows
Zoning: RSF-MH-2
Flood Zone: XPP
District: 1
Application #: 20848
Permit #: 000032883
Related Permit: Culvert: 000002181
Submitted: Monday, April 20, 2015
Issued: Monday, April 20, 2015
Expires: Friday, November 6, 2015
Completed: Friday, November 6, 2015
Status: Completed
Septic Release? No
Notes:
NOC ON FILE. 1 FOOT ABOVE ROAD.
Job Details
This is the construction of a SFD/UTILITY
Heated Area (Sqft) 2028.00
Total Area (Sqft) 2045.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Septic# (00-0000) or (X00-000) 15-0160
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0283D
Review Notes
Contractors
Name/ Business License Title Role
Roger Whiddon
Whiddon Construction Co. Inc
Liability Insurance & Employees Workers Comp Expired.
CRC1328025 Residential Contractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - Initial Driveway Dd 4/29/2015
Setback Inspection Troy Crews 5/1/2015
Foundation Inspection Troy Crews 5/5/2015
Underslab Rough Plumbing Inspection Troy Crews 5/20/2015
Temporary Power Inspection Randy Jones 6/2/2015
Temporary Power Inspection Randy Jones 6/2/2015
Sheeting and Nailing Inspection Troy Crews 6/22/2015
Sheathing and Nailing Inspection Troy Crews 6/22/2015
Framing Inspection Randy Jones 8/4/2015
Rough-In Plumbing Inspection Randy Jones 8/4/2015
Electrical Rough-In Inspection Randy Jones 8/4/2015
Heat and Air Duct Inspection Randy Jones 8/4/2015
Framing Inspection Randy Jones 8/4/2015
Rough-In Plumbing Inspection Randy Jones 8/4/2015
Electrical Rough-In Inspection Randy Jones 8/4/2015
Heat and Air Duct Inspection Randy Jones 8/4/2015
Insulation Inspection Troy Crews 8/14/2015
Permanent Power Inspection Troy Crews 10/13/2015
Passed: Engineering - Final Driveway Dd 10/16/2015
Final Inspection Troy Crews 11/6/2015
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 11/10/2015
(Requested) Foundation
(Requested) Foundation-Partial
(Requested) Under Slab Rough-in
(Requested) Temp Power-Under Ground
(Requested) Above slab Rough-in
(Requested) Electrical Rough-in
(Requested) Framing
(Requested) Heat & AC-Rough-in/Duct
(Requested) Insulation
(Requested) Final
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.21 141.10kB
Permit-32883.pdf 2023.12.21 677.68kB