Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 304 SW MULBERRY DRIVE
LAKE CITY, FL 32024
Parcel #: 02856-130
Acres: 0.50
Owner: Maronda Homes
Subdivision: Timberlands
Zoning: RSF-2
Flood Zone: X PP
District: 3
Application #: 25114
Permit #: 000027431
Related Permit: Culvert: 000001681
Submitted: Thursday, October 16, 2008
Issued: Thursday, October 16, 2008
Expires: Tuesday, January 13, 2009
Completed: Tuesday, January 13, 2009
Status: Completed
Septic Release? No
Notes:
ELEVATION CONFIRMATION LETTER REQUIRED AT SLAB, NOC ON FILE COMPACTION TEST RECEIVED, FOUNDATION SURVEY REC'D
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 2223.00
Total Area (Sqft) 2771.00
Stories 2
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0289D
Review Notes
Contractors
Name/ Business License Title Role
Theodore Brock
Maronda Homes Inc. Of Florida
County License & State License Expired.
CBC1256382 Cert Building
Inspections
Inspection Notes Performed By Date
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 1/13/2008
Underslab Rough Plumbing Inspection Harry Dicks 10/17/2008
Monolithic Slab Inspection Randy Jones 10/21/2008
Setback Inspection Randy Jones 10/21/2008
Temporary Power Inspection Wayne Russ 10/28/2008
Perimeter Beam/Column Inspection Wayne Russ 10/28/2008
Sheeting and Nailing Inspection Wayne Russ 11/12/2008
Sheathing and Nailing Inspection Wayne Russ 11/12/2008
Framing Inspection Wayne Russ 12/2/2008
Rough-In Plumbing Inspection Wayne Russ 12/2/2008
Electrical Rough-In Inspection Wayne Russ 12/2/2008
Heat and Air Duct Inspection Wayne Russ 12/2/2008
Permanent Power Inspection Wayne Russ 12/31/2008
Final Inspection Harry Dicks 1/13/2009
Documents
File Name Date File Size
Documentation 20210212 113046.pdf 2023.12.21 21.61MB
Plans 2021-02-25 14.43.15.100.pdf 2023.12.21 27.32MB
Certificate Of Occupancy.pdf 2023.12.21 142.38kB