Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 308 SW CALLAWAY DRIVE LAKE CITY FL 32024
Parcel #: 03023-252
Acres: 0.50
Owner: Isaac Construction
Subdivision: Callaway
Zoning: RSF-2
Flood Zone: OUT
District: 3
Application #: 27326
Permit #: 000021369
Related Permit: Culvert: 000000161
Submitted: Monday, December 22, 2003
Issued: Monday, December 22, 2003
Expires: Friday, May 28, 2004
Completed: Friday, May 28, 2004
Status: Completed
Septic Release? No
Notes:
ONE FOOT ABOVE THE ROAD
Job Details
This is the construction of a SFD,UTILITY
Heated Area (Sqft) 2362.00
Total Area (Sqft) 3157.00
Stories 1
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Fema map number 12023C0289D
Review Notes
Contractors

This is an owner builder project.

Name/ Business License Title Role
Isaac Construction
Isaac Construction,inc.
County License & Liability Insurance & Workers Comp Expired.
CBC059323 Building Contractor
Inspections
Inspection Notes Performed By Date
Foundation Inspection Harry Dicks 1/7/2004
Setback Inspection Harry Dicks 1/7/2004
Temporary Power Inspection Harry Dicks 1/12/2004
Underslab Rough Plumbing Inspection Richard Keen 1/16/2004
Slab Inspection Harry Dicks 1/21/2004
Framing Inspection Harry Dicks 3/5/2004
Rough-In Plumbing Inspection Richard Keen 3/5/2004
Electrical Rough-In Inspection Richard Keen 3/5/2004
Heat and Air Duct Inspection Richard Keen 3/5/2004
Permanent Power Inspection Richard Keen 4/15/2004
Final Inspection Richard Keen 5/28/2004
CERTIFICATE OF OCCUPANCY/COMPLETION DATE 5/28/2004
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2023.12.21 169.13kB