Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Building and Zoning

Request to Schedule Inspections - Step 1 of 2






Remodel
1522 SW SANTA FE DR FORT WHITE, FL 32038

Select Inspection Message
Plumbing/Gas - 1st Underground Rough–In
Plumbing/Gas - 2nd Rough-In
Electrical - 2nd Rough-In
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Electrical - Above Ceiling
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11
Fire - Aboveground Hydro - Sprinkler
Pressure test of sprinkler piping aboveground. Ref: NFPA 13 §25.2
Fire - Aboveground Sprinkler - Visual (On Site)
Building - Ext Strapping/Wall Sheathing
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
Fire - Fire Final
Building - Fire Rated Wall
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
Fire - Fire Rated Wall
Building - Footer
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Building - Framing
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Inspection was completed on 2025.08.29.
Mechanical - Framing/Fire Damper
Fire - Fuel Tank Installation
Fire - Hydrant Flow Test
Building - Insulation
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Plumbing/Gas - Interceptor
Mechanical - Kitchen Hood
Fire - Kitchen Hood – Fire Suppression Test
Building - Lath/Stucco
Checks stucco lath, weep screeds, and moisture barriers before application. Ref: FBC 110.3
Mechanical - Light Test
Fire - Light Test
Building - Lintel/Tie Beam
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
Building - Masonry Wall Reinforcing
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
Plumbing/Gas - Medical Gas
Fire - Operational Test - Alarm System
Fire - Operational Test - Chemical/Gaseous Agent
Fire - Operational Test - Fire Pump
Fire - Operational Test - Sprinkler/Standpipe
Mechanical - Performance Test and Balance
Electrical - Permanent Power
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
Mechanical - Pipe Pressure Test
Plumbing/Gas - Rain Leader
Building - Rated Assembly Fastening
Verifies fastening and components for fire-rated walls, ceilings, or roofs. Ref: FBC 703
Mechanical - Refrigeration
Building - Roof Decking
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Mechanical - Rough In
Plumbing/Gas - Sanitary
Building - Slab
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
Fire - Sprinkler System Alteration
Plumbing/Gas - Tub Set/Shower Pan
Fire - Underground Main - Flush
Fire - Underground Main - Hydro
Fire - Underground Main - Visual
Building - Vertical Cells/Columns
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
Building - Wall Sheathing
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Plumbing/Gas - Water Pipe
Building - Window Attachment
Verifies fastening of windows/doors for impact and wind load compliance. Ref: FBCR 609
Engineering - Zoning Final
Building - Final
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5