Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Building and Zoning

Request to Schedule Inspections - Step 1 of 2






New Commercial Construction
372 SW WINDSWEPT GLN LAKE CITY, FL 32024

* The final inspection cannot be requested because the assessment fees are owed on this property. Other inspections can still be requested.
* Final inspection not available until the City of Lake City has passed a tap inspection for utilities.
Select Inspection Message
Building - Framing
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Building - Fire Rated Wall
Confirms fire-related wall assemblies meet UL/FBC details and penetrations are properly sealed. Ref: FBC 703
Mechanical - Rough In
Checks ductwork, equipment location, and condensate before covering. Ref: FBC-M 603
Plumbing/Gas - 2nd Rough-In
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
Inspection was completed on 2025.10.01.
Electrical - 2nd Rough-In
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Inspection was completed on 2025.10.01.
Electrical - Above Ceiling
Inspects conduit, junctions, and wiring above ceilings before close-up. Ref: NEC Art. 300.11
Inspection was completed on 2025.10.01.
Fire - Fire Rated Wall
Confirms rated wall assemblies meet fire-resistance standards. Ref: FBC 703
Building - Insulation
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Electrical - Permanent Power
Releases power once service equipment is complete and safe. Ref: NEC Art. 230
Building - Final
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Assessment is owed.
Engineering - Zoning Final
Ensures all zoning-related site requirements (buffers, landscaping, setbacks, parking) are satisfied before CO. Columbia County LDR
Assessment is owed.
Fire - Fire Final
Full review of fire systems before occupancy. Ref: FBC 907