Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Building and Zoning

Request to Schedule Inspections - Step 1 of 2






Storage Building
977 SW HILL CREEK DR LAKE CITY, FL 32025

Select Inspection Message
Building - Footer
Inspects footing size, depth, and reinforcing steel before concrete placement. Ref: FBC 110.3(1)
Inspection was completed on 2025.08.04.
Electrical - 1st Underground Rough–In
Verifies conduit, wiring, and grounding prior to backfill. Ref: NEC Art. 300.5
Plumbing/Gas - 1st Underground Rough–In
Inspects drainage and water piping before backfill. Ref: FBC-P 312
Building - Slab
Ensures proper base, vapor barrier, reinforcing, and termite treatment before pour. Ref: FBC 110.3(1)
Building - Monolithic Slab
Inspects reinforcement, vapor barrier, termite treatment, and plumbing prior to pour. Ref: FBC 110.3(1)
Building - Framing
Reviews structural framing, load paths, fire blocking, and MEP rough-ins prior to insulation. Ref: FBC 110.3(3)
Building - Ext Strapping/Wall Sheathing
Verifies wall sheathing, nailing, and exterior strapping per wind-load requirements. Ref: FBC 110.3, 1609
Building - Wall Sheathing
Confirms nail/screw spacing and panel installation per plans. Ref: FBC 110.3(3)
Building - Insulation
Verifies insulation type, R-value, and installation before drywall. Ref: FBC Energy C101.5
Building - Lintel/Tie Beam
Ensures lintel/tie beam reinforcing steel and anchorage are correct before pour. Ref: FBC 110.3
Building - Masonry Wall Reinforcing
Confirms vertical and horizontal reinforcing per engineered plans. Ref: FBC 2122.2
Building - Roof Decking
Checks roof sheathing attachment and fastener pattern per FBC wind zones. Ref: FBC 110.3(3)
Building - Vertical Cells/Columns
Checks filled masonry cells or columns for reinforcing and grout. Ref: FBC 2122.2
Electrical - 2nd Rough-In
Checks wiring, panel placement, and boxes before cover-up. Ref: NEC Art. 110.3
Electrical - Temporary Power Service
Allows temporary power for construction use. Ref: NEC Art. 230
Plumbing/Gas - 2nd Rough-In
Reviews piping, venting, and fixtures before wall close. Ref: FBC-P 312
Building - Final
Ensures structure is complete, safe, and code-compliant before Certificate of Occupancy. Ref: FBC 110.5
Electrical - Permanent Power
Releases power once service equipment is complete and safe. Ref: NEC Art. 230